If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455032913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.900087,"lon":-114.411484,"icon":""}]} |
Location: 00/13-29-045-03W5/0 | |
Location Alias: 00/13-29-45-03 W5M | |
Location Alias 2: 00/13-29-045-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 03 | |
Section: 29 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: COREX CRYSTAL 13-29-45-3 | |
Operator Name: Journey Energy Inc. | |
License Number: 0436027 | |
License Date: 2011-08-16 | |
License Status: Issued | |
Spud Date: 2011-09-07 | |
Final Drill Date: 2011-09-20 | |
Well Total Depth: 3054.00 m | |
Surface Hole Latitude: 52.900087 | |
Surface Hole Longitude: -114.411484 |
Date | Event |
---|---|
2011-08-16 | Obtained License |
2011-09-08 | Surface Casing Operation Performed |
2011-09-09 | Well Log Performed |
2011-09-10 | Direction Drilling Operation Performed - Horizontal |
2011-09-15 | Intermediate Casing Operation Performed |
2011-09-15 | Well Log Performed |
2011-09-20 | Finished Drilling |
2011-09-20 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-20 | Well Mode changed to Drilled and Cased |
2011-09-21 | Liner Casing Operation Performed |
2011-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-22 | Rig Released |
2011-09-22 | Well Log Performed |
2011-09-27 | Well Log Performed |
2011-10-02 | Perforation Treatment Performed - Fractured |
2011-10-03 | Perforation Treatment Performed - Fractured |
2011-10-04 | Perforation Treatment Performed - Fractured |
2011-10-05 | Perforation Treatment Performed - Fractured |
2011-10-05 | Well Began Production |
2011-10-05 | Well Fluid changed to Crude Oil |
2011-10-05 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-10 | 1380.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-20 | Open Hole/Barefoot Completion | 3052.00 | 3054.00 | 0 |
2011-09-21 | Multi-Stage Fracture | 2743.60 | 2744.60 | 0 |
2011-09-21 | Multi-Stage Fracture | 2831.80 | 2832.80 | 0 |
2011-09-21 | Multi-Stage Fracture | 2919.90 | 2920.90 | 0 |
2011-09-21 | Multi-Stage Fracture | 3001.20 | 3002.20 | 0 |
2011-10-02 | Fracture | 3001.20 | 3002.20 | 0 |
2011-10-02 | Fracture | 2919.90 | 2920.90 | 0 |
2011-10-03 | Fracture | 2743.60 | 2744.60 | 0 |
2011-10-04 | Fracture | 2669.30 | 2670.30 | 0 |
2011-10-04 | Fracture | 2581.20 | 2582.20 | 0 |
2011-10-04 | Fracture | 2493.20 | 2494.20 | 0 |
2011-09-21 | Multi-Stage Fracture | 2080.50 | 2081.50 | 0 |
2011-10-04 | Fracture | 2242.80 | 2243.80 | 0 |
2011-10-05 | Fracture | 2154.80 | 2155.80 | 0 |
2011-10-05 | Fracture | 2080.50 | 2081.50 | 0 |
2011-09-21 | Multi-Stage Fracture | 2154.80 | 2155.80 | 0 |
2011-09-21 | Multi-Stage Fracture | 2242.80 | 2243.80 | 0 |
2011-09-21 | Multi-Stage Fracture | 2330.80 | 2331.80 | 0 |
2011-09-21 | Multi-Stage Fracture | 2405.20 | 2406.20 | 0 |
2011-09-21 | Multi-Stage Fracture | 2493.20 | 2494.20 | 0 |
2011-09-21 | Multi-Stage Fracture | 2581.20 | 2582.20 | 0 |
2011-09-21 | Multi-Stage Fracture | 2669.30 | 2670.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 358 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8237 | 0.0 | 0.0 | 0.0 |
2015 | 7552 | 0.0 | 0.0 | 0.0 |
2016 | 6366 | 0.0 | 0.0 | 0.0 |
2017 | 7108 | 0.0 | 0.0 | 0.0 |
2018 | 8154 | 0.0 | 0.0 | 0.0 |
2019 | 8256 | 0.0 | 0.0 | 0.0 |
2020 | 888 | 0.0 | 0.0 | 0.0 |
For data sources see[6]