X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455012414002

Well Details

Well ID: 0455012414002
Loading map...
Location: 00/14-24-045-01W5/2
Location Alias: 00/14-24-45-01 W5M
Location Alias 2: 00/14-24-045-01 W5/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 01
Section: 24
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 14-24-45-1
Operator Name: Cenovus Energy Inc.
License Number: 0182702
License Date: 1995-11-30
License Status: Issued
Spud Date: 1995-12-19
Final Drill Date: 1996-01-01
Well Total Depth: 1740.00 m
Surface Hole Latitude: 52.898676
Surface Hole Longitude: -114.014691

For data sources see[1][2]

Well History

Date Event
1995-11-30 Obtained License
1995-12-20 Surface Casing Operation Performed
1996-01-01 Finished Drilling
1996-01-01 Well Mode changed to Drilled and Cased
1996-01-02 Drill Stem Test Performed
1996-01-02 Well Log Performed
1996-01-04 Production Casing Operation Performed
1996-01-05 Rig Released
1996-01-25 Well Log Performed
1996-01-26 Perforation Treatment Performed - Jet Perforation
1996-01-26 Well Log Performed
1996-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-31 Plug Back Performed
1996-02-01 Perforation Treatment Performed - Jet Perforation
1996-02-02 Perforation Treatment Performed - Jet Perforation
1996-02-02 Well Log Performed
1996-02-06 Well Log Performed
1996-02-09 Perforation Treatment Performed - Fractured
1996-02-18 Perforation Treatment Performed - Jet Perforation
1996-02-18 Well Log Performed
1996-02-19 Perforation Treatment Performed - Fractured
1996-03-11 Well Began Production
1996-03-11 Well Fluid changed to Gas
1996-03-11 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-01-26 Perforation 1708.50 1709.50 18
1996-01-31 Packing Device Capped w/Cement 1689.00 1697.00 0
1996-02-01 Perforation 1668.00 1669.00 18
1996-02-02 Perforation 1668.00 1669.00 18
1996-02-09 Fracture 1668.00 1669.00 0
1996-02-18 Perforation 1614.50 1620.00 17
1996-02-18 Perforation 1621.50 1627.00 17
1996-02-19 Fracture 1621.50 1627.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 6138 0.0 0.0 0.0
1997 8085 0.0 0.0 0.0
1998 8321 0.0 0.0 0.0
1999 8146 0.0 0.0 0.0
2000 8494 0.0 0.0 0.0
2001 8049 0.0 0.0 0.0
2002 8299 0.0 0.0 0.0
2003 7864 0.0 0.0 0.0
2004 8517 0.0 0.0 0.0
2005 8290 0.0 0.0 0.0
2006 8519 0.0 0.0 0.0
2007 7847 0.0 0.0 0.0
2008 8495 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8205 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8424 0.0 0.0 0.0
2014 8325 0.0 0.0 0.0
2015 7962 0.0 0.0 0.0
2016 8347 0.0 0.0 0.0
2017 8598 0.0 0.0 0.0
2018 8730 0.0 0.0 0.0
2019 6795 0.0 0.0 0.0
2020 2107 0.0 0.0 0.0

For data sources see[5]

References