X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455011108000

Well Details

Well ID: 0455011108000
Loading map...
Location: 00/08-11-045-01W5/0
Location Alias: 00/08-11-45-01 W5M
Location Alias 2: 00/08-11-045-01 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 01
Section: 11
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE PEMBINA 8-11-45-1
Operator Name: Cenovus Energy Inc.
License Number: 0258967
License Date: 2001-08-28
License Status: Suspension
Spud Date: 2001-10-13
Final Drill Date: 2003-09-08
Well Total Depth: 2312.00 m
Surface Hole Latitude: 52.863514
Surface Hole Longitude: -114.033498

For data sources see[1][2]

Well History

Date Event
2001-08-28 Obtained License
2001-10-14 Surface Casing Operation Performed
2001-10-17 Direction Drilling Operation Performed - Deviate
2001-10-26 Well Log Performed
2001-10-28 Production Casing Operation Performed
2001-10-28 Rig Released
2001-10-28 Well Mode changed to Drilled and Cased
2001-11-04 Well Log Performed
2001-11-05 Perforation Treatment Performed - Open-Hole Completion
2001-11-13 Well Began Production
2001-11-13 Well Fluid changed to Crude Oil
2001-11-13 Well Mode changed to Pumping
2003-09-08 Finished Drilling
2003-09-09 Perforation Treatment Performed - Open-Hole Completion
2003-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-12-01 Well Log Performed
2004-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-05-01 Well Fluid changed to Crude Oil
2016-05-01 Well Mode changed to Suspended
2017-07-01 Well Fluid changed to Crude Oil
2017-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-10-17 1638.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-11-05 Open Hole/Barefoot Completion 2262.00 2273.30 0
2003-09-09 Open Hole/Barefoot Completion 2266.30 2312.00 0
2003-11-14 Acid Treatment 2266.30 2312.00 0
2004-06-12 Packing Device Capped w/Cement 2270.80 2276.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 624 0.0 0.0 0.0
2002 7639 0.0 0.0 0.0
2003 6346 0.0 0.0 0.0
2004 6829 0.0 0.0 0.0
2005 7702 0.0 0.0 0.0
2006 7577 0.0 0.0 0.0
2007 5789 0.0 0.0 0.0
2008 8591 0.0 0.0 0.0
2009 6058 0.0 0.0 0.0
2010 2473 0.0 0.0 0.0
2011 6081 0.0 0.0 0.0
2012 7449 0.0 0.0 0.0
2013 7639 0.0 0.0 0.0
2014 7531 0.0 0.0 0.0
2015 3602 0.0 0.0 0.0
2017 3172 0.0 0.0 0.0
2018 7524 0.0 0.0 0.0
2019 6230 0.0 0.0 0.0
2020 2093 0.0 0.0 0.0

For data sources see[6]

References