X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454283414000

Well Details

Well ID: 0454283414000
Loading map...
Location: 00/14-34-045-28W4/0
Location Alias: 00/14-34-45-28 W4M
Location Alias 2: 00/14-34-045-28 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 28
Section: 34
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 14-34-45-28
Operator Name: Cenovus Energy Inc.
License Number: 0006304
License Date: 1953-04-11
License Status: Abandoned
Spud Date: 1953-06-06
Final Drill Date: 1953-07-19
Well Total Depth: 2250.00 m
Surface Hole Latitude: 52.928761
Surface Hole Longitude: -113.985269

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-04-11 Obtained License
1953-07-15 Drill Stem Test Performed
1953-07-16 Production Casing Operation Performed
1953-07-19 Finished Drilling
1953-07-19 Lost Circulation Occurred
1953-07-19 Perforation Treatment Performed - Open-Hole Completion
1953-07-19 Well Mode changed to Drilled and Cased
1953-07-25 Well Began Production
1953-07-25 Well Fluid changed to Crude Oil
1953-07-25 Well Mode changed to Flowing
1976-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-10-29 Well Fluid changed to Crude Oil
1976-10-29 Well Mode changed to Suspended
1988-11-25 Well Log Performed
1989-01-05 Perforation Treatment Performed - Open-Hole Completion
1989-01-06 Liner Casing Operation Performed
1989-01-06 Perforation Treatment Performed - Cement Squeeze
1989-01-19 Perforation Treatment Performed - Jet Perforation
1989-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-27 Perforation Treatment Performed - Jet Perforation
1989-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-08 Perforation Treatment Performed - Cement Squeeze
1989-02-11 Perforation Treatment Performed - Jet Perforation
1989-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-14 Perforation Treatment Performed - Jet Perforation
1989-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-01 Well Fluid changed to Crude Oil
1989-03-01 Well Mode changed to Gas Lift
1991-10-29 Well Log Performed
1995-10-22 Well Log Performed
1995-11-05 Perforation Treatment Performed - Cement Squeeze
1995-11-05 Well Log Performed
1995-11-06 Perforation Treatment Performed - Jet Perforation
1995-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-26 Well Log Performed
1997-04-11 Well Log Performed
1997-04-18 Well Log Performed
1997-04-23 Perforation Treatment Performed - Jet Perforation
1997-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-25 Well Log Performed
1998-03-07 Perforation Treatment Performed - Jet Perforation
1998-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-01 Well Fluid changed to Crude Oil
1999-05-01 Well Mode changed to Suspended
2003-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-26 Plug Back Performed
2003-11-26 Well Fluid changed to Crude Oil
2003-11-26 Well Log Performed
2003-11-26 Well Mode changed to Abandoned Zone
2003-11-28 Well Log Performed
2003-12-04 Well Abandoned
2003-12-04 Well Fluid changed to Crude Oil
2003-12-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-07-19 Open Hole/Barefoot Completion 2217.10 2226.00 0
1989-02-11 Perforation 2234.50 2235.50 14
1989-02-12 Acid Treatment 2234.50 2235.50 0
1989-02-14 Perforation 2233.50 2234.50 14
1989-02-14 Acid Treatment 2233.50 2235.50 0
1989-02-16 Acid Treatment 2233.50 2235.50 0
1995-11-05 Cement Squeeze 2235.50 2235.50 0
1995-11-06 Perforation 2228.50 2231.00 17
1995-11-08 Acid Treatment 2228.50 2231.00 0
1997-04-23 Perforation 2227.50 2229.00 20
1997-04-24 Acid Treatment 2227.50 2228.30 0
1976-10-28 Packing Device Capped w/Cement 2208.30 2208.30 0
1998-03-07 Perforation 2220.00 2222.00 17
1998-03-07 Perforation 2217.00 2219.00 17
1998-03-08 Acid Treatment 2220.00 2222.00 0
1998-03-08 Acid Treatment 2217.00 2219.00 0
2003-11-26 Packing Device Capped w/Cement 2199.00 2207.00 0
1989-01-05 Open Hole/Barefoot Completion 2217.10 2250.00 0
1989-01-06 Cement Squeeze 2217.10 2250.00 0
1989-01-19 Perforation 2236.50 2237.50 14
1989-01-20 Acid Treatment 2236.50 2237.50 0
1989-01-27 Perforation 2235.00 2236.00 14
1989-01-28 Acid Treatment 2235.00 2236.00 0
1989-02-08 Cement Squeeze 2235.00 2237.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1989 2305 0.0 0.0 0.0
1990 5277 0.0 0.0 0.0
1991 6361 0.0 0.0 0.0
1992 8236 0.0 0.0 0.0
1993 8219 0.0 0.0 0.0
1994 8080 0.0 0.0 0.0
1995 4869 0.0 0.0 0.0
1996 2172 0.0 0.0 0.0
1997 1825 0.0 0.0 0.0
1998 4737 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1953-07-19 Lost Circulation 1535.60 1535.60

For data sources see[6]

References