If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454262315000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.898247,"lon":-113.663818,"icon":""}]} |
Location: 00/15-23-045-26W4/0 | |
Location Alias: 00/15-23-45-26 W4M | |
Location Alias 2: 00/15-23-045-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 26 | |
Section: 23 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: CNRL FBANK 15-23-45-26 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0249642 | |
License Date: 2001-01-23 | |
License Status: RecCertified | |
Spud Date: 2001-01-31 | |
Final Drill Date: 2001-02-05 | |
Well Total Depth: 1578.00 m | |
Surface Hole Latitude: 52.898247 | |
Surface Hole Longitude: -113.663818 |
Date | Event |
---|---|
2001-01-05 | Well Log Performed |
2001-01-23 | Obtained License |
2001-02-01 | Surface Casing Operation Performed |
2001-02-05 | Finished Drilling |
2001-02-05 | Well Log Performed |
2001-02-06 | Drill Stem Test Performed |
2001-02-07 | Production Casing Operation Performed |
2001-02-08 | Rig Released |
2001-02-08 | Well Mode changed to Drilled and Cased |
2001-02-22 | Well Log Performed |
2001-02-26 | Well Log Performed |
2001-02-27 | Perforation Treatment Performed - Jet Perforation |
2001-03-05 | Perforation Treatment Performed - Fractured |
2001-03-07 | Perforation Treatment Performed - Fractured |
2001-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-03-10 | Plug Back Performed |
2001-03-10 | Well Log Performed |
2001-03-10 | Well Mode changed to Abandoned Zone |
2001-06-13 | Perforation Treatment Performed - Jet Perforation |
2001-06-13 | Well Log Performed |
2001-06-14 | Perforation Treatment Performed - Cement Squeeze |
2001-06-14 | Plug Back Performed |
2001-06-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-18 | Perforation Treatment Performed - Jet Perforation |
2001-06-19 | Perforation Treatment Performed - Cement Squeeze |
2001-06-19 | Plug Back Performed |
2001-06-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-20 | Perforation Treatment Performed - Jet Perforation |
2001-06-20 | Well Log Performed |
2001-06-21 | Perforation Treatment Performed - Cement Squeeze |
2001-06-21 | Plug Back Performed |
2001-06-22 | Perforation Treatment Performed - Jet Perforation |
2001-06-22 | Well Log Performed |
2001-06-23 | Perforation Treatment Performed - Cement Squeeze |
2001-06-23 | Plug Back Performed |
2001-06-24 | Well Log Performed |
2001-06-25 | Perforation Treatment Performed - Jet Perforation |
2001-06-25 | Well Log Performed |
2001-06-26 | Perforation Treatment Performed - Cement Squeeze |
2001-06-26 | Plug Back Performed |
2001-06-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-27 | Perforation Treatment Performed - Jet Perforation |
2001-06-27 | Well Log Performed |
2001-06-28 | Perforation Treatment Performed - Cement Squeeze |
2001-06-28 | Plug Back Performed |
2001-06-29 | Well Log Performed |
2001-07-04 | Well Abandoned |
2001-07-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-02-27 | Perforation | 1360.50 | 1364.00 | 17 |
2001-06-20 | Packing Device Capped w/Cement | 786.00 | 794.00 | 0 |
2001-06-20 | Perforation | 705.00 | 706.00 | 17 |
2001-06-21 | Cement Squeeze | 705.00 | 706.00 | 0 |
2001-06-22 | Perforation | 531.00 | 532.00 | 17 |
2001-06-23 | Cement Squeeze | 531.00 | 532.00 | 0 |
2001-06-25 | Perforation | 525.00 | 526.00 | 17 |
2001-06-26 | Cement Squeeze | 525.00 | 526.00 | 0 |
2001-06-27 | Packing Device Capped w/Cement | 512.00 | 520.00 | 0 |
2001-06-27 | Perforation | 295.00 | 296.00 | 17 |
2001-06-28 | Cement Squeeze | 295.00 | 296.00 | 0 |
2001-03-05 | Fracture | 1360.50 | 1364.00 | 0 |
2001-03-07 | Fracture | 1360.50 | 1364.00 | 0 |
2001-03-10 | Packing Device Capped w/Cement | 1347.00 | 1355.00 | 0 |
2001-06-13 | Perforation | 1314.00 | 1315.00 | 17 |
2001-06-14 | Cement Squeeze | 1314.00 | 1315.00 | 0 |
2001-06-18 | Packing Device Capped w/Cement | 1299.00 | 1307.00 | 0 |
2001-06-18 | Perforation | 800.00 | 801.00 | 17 |
2001-06-19 | Cement Squeeze | 800.00 | 801.00 | 0 |
For data sources see[4]