X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454231308003

Well Details

Well ID: 0454231308003
Loading map...
Location: 00/08-13-045-23W4/3
Location Alias: 00/08-13-45-23 W4M
Location Alias 2: 00/08-13-045-23 W4/03
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 23
Section: 13
County/Municipality: County of Wetaskiwin No. 10
Well Name: PINE CLIFF WETWIN 8-13-45-23
Operator Name: Pine Cliff Energy Ltd.
License Number: 0327609
License Date: 2005-03-04
License Status: Amended
Spud Date: 2005-03-25
Final Drill Date: 2005-03-29
Well Total Depth: 1482.00 m
Surface Hole Latitude: 52.880133
Surface Hole Longitude: -113.207018

For data sources see[1][2]

Well History

Date Event
2005-03-04 Obtained License
2005-03-26 Surface Casing Operation Performed
2005-03-27 Direction Drilling Operation Performed - Deviate
2005-03-29 Finished Drilling
2005-03-29 Well Log Performed
2005-03-29 Well Mode changed to Drilled and Cased
2005-03-30 Production Casing Operation Performed
2005-03-30 Rig Released
2005-06-08 Well Log Performed
2005-06-15 Perforation Treatment Performed - Jet Perforation
2005-06-15 Well Log Performed
2005-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-23 Plug Back Performed
2005-06-23 Well Log Performed
2005-06-24 Perforation Treatment Performed - Jet Perforation
2010-12-15 Perforation Treatment Performed - Jet Perforation
2010-12-20 Perforation Treatment Performed - Fractured
2011-02-04 Well Began Production
2011-02-04 Well Fluid changed to Coalbed Methane-Coals Only
2011-02-04 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-03-27 190.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-15 Perforation 1229.00 1236.00 17
2010-12-20 Fracture 281.90 283.00 0
2010-12-20 Fracture 283.90 284.60 0
2010-12-20 Fracture 288.40 289.30 0
2005-06-23 Packing Device Capped w/Cement 1216.00 1224.00 0
2005-06-24 Perforation 1176.00 1177.00 17
2005-06-24 Perforation 1167.00 1168.00 17
2010-12-15 Perforation 276.10 277.10 17
2010-12-15 Perforation 281.90 283.00 17
2010-12-15 Perforation 283.90 284.60 17
2010-12-15 Perforation 288.40 289.30 17
2010-12-20 Fracture 276.10 277.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7894 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8743 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8439 0.0 0.0 0.0
2019 7264 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[6]

References