X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454221302000

Well Details

Well ID: 0454221302000
Loading map...
Location: 00/02-13-045-22W4/0
Location Alias: 00/02-13-45-22 W4M
Location Alias 2: 00/02-13-045-22 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 22
Section: 13
County/Municipality: Camrose County
Well Name: CPC RESOURCES NEWNOR 2-13-45-22
Operator Name: Lynx Energy ULC
License Number: 0166486
License Date: 1994-04-15
License Status: Issued
Spud Date: 1994-05-13
Final Drill Date: 1994-05-20
Well Total Depth: 1418.00 m
Surface Hole Latitude: 52.875777
Surface Hole Longitude: -113.063351

For data sources see[1][2]

Well History

Date Event
1994-04-15 Obtained License
1994-05-14 Surface Casing Operation Performed
1994-05-20 Finished Drilling
1994-05-20 Kick Occurred
1994-05-21 Well Log Performed
1994-05-22 Production Casing Operation Performed
1994-05-22 Well Log Performed
1994-05-23 Rig Released
1994-05-23 Well Mode changed to Drilled and Cased
1994-06-04 Perforation Treatment Performed - Jet Perforation
1994-06-06 Well Log Performed
1994-06-08 Perforation Treatment Performed - Cement Squeeze
1994-06-08 Perforation Treatment Performed - Jet Perforation
1994-06-09 Well Log Performed
1994-06-13 Perforation Treatment Performed - Jet Perforation
1994-06-13 Well Log Performed
1994-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-16 Well Log Performed
2002-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-21 Plug Back Performed
2002-03-21 Well Log Performed
2002-03-21 Well Mode changed to Abandoned Zone
2002-03-22 Well Log Performed
2002-03-23 Perforation Treatment Performed - Jet Perforation
2002-03-23 Well Log Performed
2002-05-17 Perforation Treatment Performed - Fractured
2002-05-21 Well Log Performed
2002-05-24 Perforation Treatment Performed - Casing Patch (Over Perfs)
2002-05-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-06-04 Perforation 1276.50 1277.50 13
1994-06-14 Acid Treatment 1276.50 1277.50 0
2002-03-21 Packing Device Capped w/Cement 1255.00 1263.00 0
2002-03-23 Perforation 421.00 423.00 17
2002-03-23 Perforation 352.50 356.50 17
2002-03-23 Perforation 343.00 345.00 17
2002-03-23 Perforation 318.00 320.50 17
2002-05-17 Fracture 352.50 356.50 0
2002-05-17 Fracture 343.00 345.00 0
2002-05-24 Casing Patch 352.50 356.50 0
1994-06-08 Perforation 1288.00 1289.00 13
1994-06-08 Cement Squeeze 1288.00 1289.00 0
1994-06-08 Cement Squeeze 1276.50 1277.50 0
1994-06-13 Perforation 1276.50 1277.50 13
1994-06-13 Perforation 1278.00 1278.50 13
1994-06-13 Perforation 1279.00 1280.00 13
1994-06-14 Acid Treatment 1279.00 1280.00 0
1994-06-14 Acid Treatment 1278.00 1278.50 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-05-20 Kick 1399.00 1399.00

For data sources see[5]

References