X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454212911003

Well Details

Well ID: 0454212911003
Loading map...
Location: 00/11-29-045-21W4/3
Location Alias: 00/11-29-45-21 W4M
Location Alias 2: 00/11-29-045-21 W4/03
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 21
Section: 29
County/Municipality: Camrose County
Well Name: CNRL DUHAMEL 11-29MU-45-21
Operator Name: Canadian Natural Resources Limited
License Number: 0002815
License Date: 1951-04-26
License Status: Abandoned
Spud Date: 1951-04-28
Final Drill Date: 1951-05-19
Well Total Depth: 1464.30 m
Surface Hole Latitude: 52.911007
Surface Hole Longitude: -113.019228

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-04-26 Obtained License
1951-05-04 Drill Stem Test Performed
1951-05-07 Drill Stem Test Performed
1951-05-08 Drill Stem Test Performed
1951-05-10 Drill Stem Test Performed
1951-05-11 Drill Stem Test Performed
1951-05-16 Drill Stem Test Performed
1951-05-19 Finished Drilling
1951-05-19 Well Mode changed to Drilled and Cased
1951-05-21 Production Casing Operation Performed
1951-05-23 Perforation Treatment Performed - Jet Perforation
1951-05-25 Perforation Treatment Performed - Jet Perforation
1951-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-05-29 Perforation Treatment Performed - Jet Perforation
1984-12-10 Perforation Treatment Performed - Casing Patch (Over Perfs)
1984-12-10 Well Log Performed
1993-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-12 Perforation Treatment Performed - Jet Perforation
1993-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-20 Well Log Performed
1994-09-22 Well Log Performed
1995-11-16 Perforation Treatment Performed - Cement Squeeze
1995-11-16 Well Log Performed
1995-11-19 Perforation Treatment Performed - Jet Perforation
1995-11-19 Well Log Performed
1995-11-22 Perforation Treatment Performed - Jet Perforation
1995-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-10 Well Log Performed
1996-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-11 Plug Back Performed
1996-09-11 Well Log Performed
1996-09-12 Perforation Treatment Performed - Jet Perforation
1996-09-13 Well Log Performed
1996-09-14 Perforation Treatment Performed - Jet Perforation
1996-09-14 Well Log Performed
1996-09-15 Perforation Treatment Performed - Jet Perforation
1996-09-24 Well Began Production
1996-09-24 Well Fluid changed to Gas
1996-09-24 Well Mode changed to Flowing
2002-05-01 Well Fluid changed to Gas
2002-05-01 Well Mode changed to Suspended
2006-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-16 Plug Back Performed
2006-06-16 Well Fluid changed to Gas
2006-06-16 Well Log Performed
2006-06-16 Well Mode changed to Abandoned Zone
2006-06-17 Perforation Treatment Performed - Jet Perforation
2006-06-17 Well Log Performed
2006-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-18 Perforation Treatment Performed - Jet Perforation
2006-06-18 Perforation Treatment Performed - Remedial Casing
2006-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-19 Perforation Treatment Performed - Cement Plug
2006-06-19 Perforation Treatment Performed - Remedial Casing
2006-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-20 Perforation Treatment Performed - Jet Perforation
2006-06-20 Perforation Treatment Performed - Remedial Casing
2006-06-21 Perforation Treatment Performed - Remedial Casing
2006-06-22 Perforation Treatment Performed - Cement Plug
2006-07-08 Well Abandoned
2006-07-08 Well Fluid changed to Gas
2006-07-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-05-23 Perforation 1462.40 1463.00 20
1995-11-16 Cement Squeeze 1356.10 1358.80 0
1995-11-19 Perforation 1352.00 1355.00 17
1995-11-22 Perforation 1352.00 1355.00 13
1995-11-23 Acid Treatment 1352.00 1355.00 0
1996-09-11 Packing Device Capped w/Cement 1339.00 1347.00 0
1996-09-12 Perforation 1308.20 1312.20 17
1996-09-14 Perforation 1302.00 1305.00 17
1996-09-15 Perforation 1281.00 1283.00 17
2006-06-16 Packing Device Capped w/Cement 1292.00 1300.00 0
2006-06-16 Packing Device Capped w/Cement 1267.00 1275.00 0
1951-05-25 Perforation 1453.90 1463.00 20
2006-06-17 Perforation 1042.00 1045.00 13
2006-06-18 Remedial Casing Cementing 1042.00 1045.00 0
2006-06-18 Packing Device Capped w/Cement 1023.00 1038.00 0
2006-06-18 Perforation 917.00 920.00 13
2006-06-19 Remedial Casing Cementing 917.00 920.00 0
2006-06-19 Packing Device Capped w/Cement 898.00 913.00 0
2006-06-19 Cement Plug 740.00 795.00 0
2006-06-20 Perforation 517.00 520.00 13
2006-06-20 Remedial Casing Cementing 517.00 520.00 0
2006-06-20 Packing Device Capped w/Cement 498.00 513.00 0
1951-05-26 Acid Treatment 1453.90 1463.00 0
2006-06-20 Perforation 224.70 227.70 13
2006-06-21 Remedial Casing Cementing 224.70 227.70 0
2006-06-22 Cement Plug 153.20 243.00 0
1953-05-29 Perforation 1367.00 1369.20 20
1984-12-10 Casing Patch 1361.30 1370.50 0
1993-02-11 Packing Device Capped w/Cement 1370.00 1378.00 0
1993-02-12 Perforation 1356.10 1358.80 13
1993-02-12 Perforation 1360.90 1363.10 13
1993-02-13 Acid Treatment 1356.10 1363.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2030 0.0 0.0 0.0

For data sources see[5]

References