X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454212410000

Well Details

Well ID: 0454212410000
Loading map...
Location: 00/10-24-045-21W4/0
Location Alias: 00/10-24-45-21 W4M
Location Alias 2: 00/10-24-045-21 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 21
Section: 24
County/Municipality: Camrose County
Well Name: STRIDE 10A DUHAMEL 10-24-45-21
Operator Name: TAQA North Ltd.
License Number: 0268452
License Date: 2002-03-08
License Status: Abandoned
Spud Date: 2002-03-16
Final Drill Date: 2002-03-16
Well Total Depth: 499.00 m
Surface Hole Latitude: 52.895817
Surface Hole Longitude: -112.913140

For data sources see[1][2]

Well History

Date Event
2002-03-08 Obtained License
2002-03-13 Conductor Casing Operation Performed
2002-03-16 Finished Drilling
2002-03-16 Well Log Performed
2002-03-17 Production Casing Operation Performed
2002-03-17 Rig Released
2002-03-17 Well Mode changed to Drilled and Cased
2002-04-07 Perforation Treatment Performed - Jet Perforation
2002-04-08 Perforation Treatment Performed - Jet Perforation
2002-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-24 Perforation Treatment Performed - Jet Perforation
2002-09-24 Plug Back Performed
2002-09-24 Well Mode changed to Abandoned Zone
2003-12-22 Perforation Treatment Performed - Jet Perforation
2003-12-27 Perforation Treatment Performed - Fractured
2013-10-10 Perforation Treatment Performed - Cement Plug
2013-10-10 Plug Back Performed
2013-10-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-04-07 Perforation 370.00 372.00 13
2003-12-27 Fracture 250.00 252.00 0
2003-12-27 Fracture 203.00 205.00 0
2003-12-27 Fracture 172.00 174.00 0
2013-10-10 Cement Plug 31.00 337.00 0
2002-04-07 Perforation 356.00 358.00 13
2002-04-08 Perforation 388.50 390.00 13
2002-09-24 Packing Device Capped w/Cement 338.00 346.00 0
2002-09-24 Perforation 277.00 278.00 17
2003-12-22 Perforation 250.00 252.00 17
2003-12-22 Perforation 203.00 205.00 17
2003-12-22 Perforation 172.00 174.00 17
2003-12-27 Fracture 277.80 278.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-10 No Incident Encountered 0.00 0.00

For data sources see[5]

References