X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454181109002

Well Details

Well ID: 0454181109002
Loading map...
Location: 00/09-11-045-18W4/2
Location Alias: 00/09-11-45-18 W4M
Location Alias 2: 00/09-11-045-18 W4/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 18
Section: 11
County/Municipality: Camrose County
Well Name: PANTHER ET AL HOLMBERG 9-11-45-18
Operator Name: Canadian Natural Resources Limited
License Number: 0092040
License Date: 1981-09-01
License Status: Issued
Spud Date: 1981-09-03
Final Drill Date: 1981-09-07
Well Total Depth: 1145.00 m
Surface Hole Latitude: 52.865438
Surface Hole Longitude: -112.500750

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-01 Obtained License
1981-09-07 Finished Drilling
1981-09-07 Well Mode changed to Drilled and Cased
1981-09-08 Drill Stem Test Performed
1981-09-09 Production Casing Operation Performed
1982-06-21 Perforation Treatment Performed - Jet Perforation
1989-07-19 Perforation Treatment Performed - Jet Perforation
1989-07-19 Well Log Performed
1990-08-21 Perforation Treatment Performed - Jet Perforation
1990-08-21 Well Log Performed
1991-11-05 Well Log Performed
1991-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-21 Perforation Treatment Performed - Jet Perforation
2002-08-21 Well Log Performed
2002-08-24 Perforation Treatment Performed - Fractured
2003-12-11 Well Began Production
2003-12-11 Well Fluid changed to Gas
2003-12-11 Well Mode changed to Flowing
2019-09-30 Well Fluid changed to Gas
2019-09-30 Well Mode changed to Suspended
2020-02-05 Well Fluid changed to Gas
2020-02-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-21 Perforation 1034.50 1035.50 7
1990-08-21 Perforation 1040.50 1041.50 13
1990-08-21 Perforation 1043.00 1044.00 13
1991-11-07 Acid Treatment 1034.50 1039.50 0
2002-08-21 Perforation 380.80 383.50 17
2002-08-21 Perforation 395.50 397.50 17
2002-08-24 Fracture 380.80 397.50 0
1982-06-21 Perforation 1038.50 1039.50 7
1982-06-21 Perforation 1040.50 1041.50 7
1989-07-19 Perforation 1034.50 1035.50 14
1989-07-19 Perforation 1038.50 1039.50 14
1989-07-19 Perforation 1040.50 1041.50 14
1989-07-19 Perforation 1043.00 1044.00 14
1990-08-21 Perforation 1034.50 1035.50 13
1990-08-21 Perforation 1038.50 1039.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 744 0.0 0.0 0.0
2004 8575 0.0 0.0 0.0
2005 8647 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8758 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8691 0.0 0.0 0.0
2017 8687 0.0 0.0 0.0
2018 8087 0.0 0.0 0.0
2019 2247 0.0 0.0 0.0
2020 1272 0.0 0.0 0.0

For data sources see[5]

References