X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454181007000

Well Details

Well ID: 0454181007000
Loading map...
Location: 00/07-10-045-18W4/0
Location Alias: 00/07-10-45-18 W4M
Location Alias 2: 00/07-10-045-18 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 18
Section: 10
County/Municipality: Camrose County
Well Name: PANTHER ET AL HOLMBERG 7-10-45-18
Operator Name: Canadian Natural Resources Limited
License Number: 0073351
License Date: 1978-12-06
License Status: RecCertified
Spud Date: 1978-12-09
Final Drill Date: 1978-12-13
Well Total Depth: 1150.00 m
Surface Hole Latitude: 52.862455
Surface Hole Longitude: -112.527057

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-06 Obtained License
1978-12-13 Finished Drilling
1978-12-13 Well Log Performed
1978-12-13 Well Mode changed to Drilled and Cased
1978-12-14 Drill Stem Test Performed
1978-12-15 Production Casing Operation Performed
1979-01-05 Perforation Treatment Performed - Jet Perforation
1979-01-08 Perforation Treatment Performed - Jet Perforation
1979-01-09 Perforation Treatment Performed - Cement Squeeze
1979-01-10 Perforation Treatment Performed - Jet Perforation
1979-05-01 Well Began Production
1979-05-01 Well Fluid changed to Gas
1979-05-01 Well Mode changed to Flowing
1980-01-16 Well Fluid changed to Gas
1980-01-16 Well Mode changed to Suspended
1980-08-07 Well Fluid changed to Gas
1980-08-07 Well Mode changed to Flowing
1987-05-15 Perforation Treatment Performed - Jet Perforation
1987-05-15 Well Log Performed
1992-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-13 Plug Back Performed
1992-11-13 Well Log Performed
1992-11-20 Well Log Performed
1992-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-23 Perforation Treatment Performed - Jet Perforation
1992-11-23 Perforation Treatment Performed - Remedial Casing
1992-11-23 Well Abandoned
1992-11-23 Well Fluid changed to Gas
1992-11-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-05 Perforation 1044.00 1046.00 7
1979-01-08 Perforation 1049.50 1050.00 13
1979-01-09 Cement Squeeze 1044.00 1050.00 0
1979-01-10 Perforation 1044.00 1045.00 7
1987-05-15 Perforation 1044.00 1046.00 13
1992-11-13 Packing Device Capped w/Cement 1025.00 1033.00 0
1992-11-23 Perforation 372.00 373.00 13
1992-11-23 Remedial Casing Cementing 372.00 373.00 0
1992-11-23 Packing Device Capped w/Cement 269.00 368.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 4827 0.0 0.0 0.0
1980 2067 0.0 0.0 0.0
1982 186 0.0 0.0 0.0
1983 1810 0.0 0.0 0.0
1984 3119 0.0 0.0 0.0
1985 1758 0.0 0.0 0.0
1986 1626 0.0 0.0 0.0
1987 4010 0.0 0.0 0.0
1988 289 0.0 0.0 0.0
1989 472 0.0 0.0 0.0
1991 692 0.0 0.0 0.0

For data sources see[5]

References