X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454120206000

Well Details

Well ID: 0454120206000
Loading map...
Location: 00/06-02-045-12W4/0
Location Alias: 00/06-02-45-12 W4M
Location Alias 2: 00/06-02-045-12 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 12
Section: 02
County/Municipality: Flagstaff County
Well Name: VOYAGER ET AL KILLAMN 6-2-45-12
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0057153
License Date: 1976-02-19
License Status: RecCertified
Spud Date: 1976-03-05
Final Drill Date: 1976-03-08
Well Total Depth: 905.30 m
Surface Hole Latitude: 52.847298
Surface Hole Longitude: -111.641738

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-19 Obtained License
1976-03-07 Drill Stem Test Performed
1976-03-08 Finished Drilling
1976-03-08 Well Mode changed to Drilled and Cased
1976-03-09 Drill Stem Test Performed
1976-03-09 Production Casing Operation Performed
1976-05-29 Perforation Treatment Performed - Jet Perforation
1976-06-19 Perforation Treatment Performed - Fractured
1976-08-01 Well Began Production
1976-08-01 Well Fluid changed to Gas
1976-08-01 Well Mode changed to Flowing
1977-08-26 Perforation Treatment Performed - Jet Perforation
1977-08-26 Well Fluid changed to Gas
1977-08-26 Well Mode changed to Flowing
1979-02-01 Well Fluid changed to Gas
1979-02-01 Well Mode changed to Suspended
1981-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-05-06 Perforation Treatment Performed - Jet Perforation
1981-05-06 Well Fluid changed to Gas
1981-05-06 Well Mode changed to Flowing
1981-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-01 Well Fluid changed to Gas
1982-02-01 Well Mode changed to Suspended
1982-05-01 Well Fluid changed to Gas
1982-05-01 Well Mode changed to Flowing
1984-01-01 Well Fluid changed to Gas
1984-01-01 Well Mode changed to Flowing
1986-05-12 Well Fluid changed to Gas
1986-05-12 Well Mode changed to Suspended
1991-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-12-05 Plug Back Performed
1991-12-05 Well Fluid changed to Gas
1991-12-05 Well Log Performed
1991-12-05 Well Mode changed to Abandoned Zone
1991-12-06 Perforation Treatment Performed - Jet Perforation
1991-12-06 Perforation Treatment Performed - Remedial Casing
1991-12-06 Well Log Performed
1992-01-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-05-29 Perforation 698.60 700.10 7
1991-12-06 Remedial Casing Cementing 240.00 241.00 0
1976-06-19 Fracture 698.60 700.10 0
1977-08-26 Perforation 854.40 855.90 10
1981-05-06 Packing Device Capped w/Cement 839.30 847.30 0
1981-05-06 Perforation 780.90 781.50 7
1981-05-07 Acid Treatment 780.90 781.50 0
1991-12-05 Packing Device Capped w/Cement 767.00 775.00 0
1991-12-05 Packing Device Capped w/Cement 682.00 690.00 0
1991-12-06 Perforation 240.00 241.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1407 0.0 0.0 0.0
1977 1442 0.0 0.0 0.0
1978 7235 0.0 0.0 0.0
1979 361 0.0 0.0 0.0
1981 2683 0.0 0.0 0.0
1982 1061 0.0 0.0 0.0
1983 2477 0.0 0.0 0.0
1984 5612 0.0 0.0 0.0
1985 2153 0.0 0.0 0.0
1986 912 0.0 0.0 0.0

For data sources see[5]

References