X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454110511000

Well Details

Well ID: 0454110511000
Loading map...
Location: 00/11-05-045-11W4/0
Location Alias: 00/11-05-45-11 W4M
Location Alias 2: 00/11-05-045-11 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 11
Section: 05
County/Municipality: Flagstaff County
Well Name: VOYAGER KILLAMN 11-5-45-11
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0059710
License Date: 1976-08-11
License Status: RecCertified
Spud Date: 1976-08-12
Final Drill Date: 1976-08-15
Well Total Depth: 890.00 m
Surface Hole Latitude: 52.852846
Surface Hole Longitude: -111.568634

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-11 Obtained License
1976-08-14 Drill Stem Test Performed
1976-08-15 Drill Stem Test Performed
1976-08-15 Finished Drilling
1976-08-15 Well Mode changed to Drilled and Cased
1976-08-16 Drill Stem Test Performed
1976-08-16 Production Casing Operation Performed
1976-08-27 Perforation Treatment Performed - Jet Perforation
1977-08-26 Perforation Treatment Performed - Jet Perforation
1978-11-08 Well Began Production
1978-11-08 Well Fluid changed to Gas
1978-11-08 Well Mode changed to Flowing
1979-12-01 Well Fluid changed to Gas
1979-12-01 Well Mode changed to Flowing
1980-01-01 Well Fluid changed to Gas
1980-01-01 Well Mode changed to Suspended
1982-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-27 Well Fluid changed to Gas
1982-09-27 Well Mode changed to Abandoned Zone
1982-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-28 Perforation Treatment Performed - Jet Perforation
1989-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-05-08 Plug Back Performed
1989-05-08 Well Log Performed
1989-05-09 Perforation Treatment Performed - Jet Perforation
1989-05-09 Well Log Performed
1989-05-10 Perforation Treatment Performed - Remedial Casing
1989-05-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-27 Perforation 798.00 798.90 10
1977-08-26 Perforation 851.90 853.40 10
1982-09-27 Packing Device Capped w/Cement 840.90 848.90 0
1982-09-28 Packing Device Capped w/Cement 787.50 795.50 0
1982-09-28 Perforation 696.80 698.60 12
1989-05-08 Packing Device Capped w/Cement 682.00 690.00 0
1989-05-09 Perforation 219.80 220.00 13
1989-05-10 Remedial Casing Cementing 219.80 220.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 678 0.0 0.0 0.0
1979 705 0.0 0.0 0.0

For data sources see[5]

References