X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445110504000

Well Details

Well ID: 0445110504000
Loading map...
Location: 00/04-05-044-11W5/0
Location Alias: 00/04-05-44-11 W5M
Location Alias 2: 00/04-05-044-11 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 11
Section: 05
County/Municipality: Clearwater County
Well Name: VEI HZ FERRIER 4-5-44-11
Operator Name: Vermilion Energy Inc.
License Number: 0475828
License Date: 2015-06-19
License Status: Issued
Spud Date: 2015-08-14
Final Drill Date: 2015-09-06
Well Total Depth: 5719.00 m
Surface Hole Latitude: 52.785755
Surface Hole Longitude: -115.571856

For data sources see[1][2]

Well History

Date Event
2015-06-19 Obtained License
2015-08-15 Surface Casing Operation Performed
2015-08-17 Lost Circulation Occurred
2015-08-27 Intermediate Casing Operation Performed
2015-08-29 Direction Drilling Operation Performed - Deviate
2015-08-30 Direction Drilling Operation Performed - Horizontal
2015-09-06 Finished Drilling
2015-09-06 Well Log Performed
2015-09-06 Well Mode changed to Drilled and Cased
2015-09-07 Well Log Performed
2015-09-11 Production Casing Operation Performed
2015-09-14 Rig Released
2015-09-14 Well Log Performed
2015-09-28 Perforation Treatment Performed - Open-Hole Completion
2015-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-10 Well Began Production
2015-11-10 Well Fluid changed to Gas
2015-11-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-08-14 Nabors Drilling Limited 19 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-08-29 2383.80 Deviate (5 - 79 degrees)
2015-08-30 2817.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-28 Open Hole/Barefoot Completion 5714.00 5719.00 0
2015-09-29 Multi-Stage Fracture 4952.30 4952.40 0
2015-09-29 Multi-Stage Fracture 4866.30 4866.40 0
2015-09-29 Multi-Stage Fracture 4766.80 4766.90 0
2015-09-29 Multi-Stage Fracture 4680.80 4680.90 0
2015-09-29 Multi-Stage Fracture 4594.80 4594.90 0
2015-09-29 Multi-Stage Fracture 4495.20 4495.30 0
2015-09-29 Multi-Stage Fracture 4409.60 4409.70 0
2015-09-29 Multi-Stage Fracture 4323.50 4323.60 0
2015-09-30 Multi-Stage Fracture 4237.50 4237.60 0
2015-09-30 Multi-Stage Fracture 4137.90 4138.00 0
2015-09-29 Multi-Stage Fracture 5675.80 5675.90 0
2015-09-30 Multi-Stage Fracture 4051.90 4052.00 0
2015-09-30 Multi-Stage Fracture 3965.90 3966.00 0
2015-09-30 Multi-Stage Fracture 3866.30 3866.40 0
2015-09-30 Multi-Stage Fracture 3780.90 3781.00 0
2015-09-30 Multi-Stage Fracture 3695.30 3695.40 0
2015-09-30 Multi-Stage Fracture 3595.80 3595.90 0
2015-09-30 Multi-Stage Fracture 3510.80 3510.90 0
2015-09-30 Multi-Stage Fracture 3425.70 3425.80 0
2015-09-30 Multi-Stage Fracture 3326.30 3326.40 0
2015-09-30 Multi-Stage Fracture 3240.40 3240.50 0
2015-09-29 Multi-Stage Fracture 5589.80 5589.90 0
2015-09-30 Multi-Stage Fracture 3142.70 3142.80 0
2015-09-30 Multi-Stage Fracture 3058.00 3058.10 0
2015-09-30 Multi-Stage Fracture 2972.10 2972.20 0
2015-09-30 Multi-Stage Fracture 2877.10 2877.20 0
2015-09-29 Multi-Stage Fracture 5491.30 5491.40 0
2015-09-29 Multi-Stage Fracture 5405.30 5405.40 0
2015-09-29 Multi-Stage Fracture 5306.40 5306.50 0
2015-09-29 Multi-Stage Fracture 5222.30 5222.40 0
2015-09-29 Multi-Stage Fracture 5137.50 5137.60 0
2015-09-29 Multi-Stage Fracture 5038.30 5038.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-29 2015-09-30 2,717 6,356 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.6666 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 13.1096 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 0.4106 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0412 N/A
Methanol 67-56-1 100 0.0412 N/A
Water 7732-18-5 100 0.0412 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0048 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.1819 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 4.4849 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.1 N/A
Oxyalkylated alcohol 9014 100 0.1 N/A
Petroleum distillates 64742-47-8 100 0.1 N/A
Polyacrylate 9014 100 0.1 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-03 2015-09-29 Surface Water - River 5824
2015-09-24 2015-09-29 Municipal Water 896
2015-09-20 2015-09-29 Municipal Water 88

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1113 0.0 0.0 0.0
2016 8251 0.0 0.0 0.0
2017 8643 0.0 0.0 0.0
2018 7575 0.0 0.0 0.0
2019 8585 0.0 0.0 0.0
2020 2086 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-17 Lost Circulation 1087.00 1941.00
2015-10-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References