X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445110203003

Well Details

Well ID: 0445110203003
Loading map...
Location: 00/03-02-044-11W5/3
Location Alias: 00/03-02-44-11 W5M
Location Alias 2: 00/03-02-044-11 W5/03
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 11
Section: 02
County/Municipality: Clearwater County
Well Name: ACL ET AL SUNCHILD 3-2-44-11
Operator Name: Obsidian Energy Ltd.
License Number: 0178653
License Date: 1995-06-16
License Status: RecCertified
Spud Date: 1995-07-13
Final Drill Date: 1997-03-10
Well Total Depth: 2960.00 m
Surface Hole Latitude: 52.759508
Surface Hole Longitude: -115.487696

For data sources see[1][2]

Well History

Date Event
1995-06-16 Obtained License
1997-02-16 Direction Drilling Operation Performed - Horizontal
1997-03-10 Finished Drilling
1997-03-10 Well Mode changed to Drilled and Cased
1997-03-11 Well Log Performed
1997-03-12 Well Log Performed
1997-03-14 Liner Casing Operation Performed
1997-03-19 Rig Released
1997-04-01 Perforation Treatment Performed - Jet Perforation
1997-06-11 Well Log Performed
1997-06-12 Perforation Treatment Performed - Cement Squeeze
1997-06-20 Perforation Treatment Performed - Jet Perforation
1997-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-05 Perforation Treatment Performed - Jet Perforation
1998-02-05 Well Log Performed
1998-02-08 Perforation Treatment Performed - Jet Perforation
1998-02-08 Well Log Performed
1998-02-09 Perforation Treatment Performed - Remedial Casing
1998-02-13 Well Log Performed
1998-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-14 Perforation Treatment Performed - Cement Squeeze
1998-02-22 Perforation Treatment Performed - Jet Perforation
1998-02-22 Well Log Performed
1998-03-03 Perforation Treatment Performed - Fractured
1998-09-24 Well Log Performed
1998-09-25 Well Log Performed
1998-09-26 Well Log Performed
1998-10-07 Perforation Treatment Performed - Cement Squeeze
1998-10-07 Perforation Treatment Performed - Jet Perforation
1998-10-07 Well Log Performed
1998-10-07 Well Mode changed to Drilled and Cased
1998-10-11 Well Log Performed
1998-10-15 Perforation Treatment Performed - Jet Perforation
1998-10-15 Well Log Performed
1998-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-07 Perforation Treatment Performed - Cement Squeeze
2000-06-07 Plug Back Performed
2000-06-14 Perforation Treatment Performed - Jet Perforation
2000-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-17 Plug Back Performed
2000-06-18 Well Abandoned
2000-06-18 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-02-16 1875.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-01 Perforation 2920.50 2927.00 13
1998-02-05 Perforation 2609.00 2609.30 80
1998-02-05 Perforation 2609.80 2610.10 80
1998-02-05 Perforation 2610.60 2610.90 80
1998-02-08 Perforation 2623.00 2623.30 80
1998-02-08 Perforation 2623.80 2624.10 80
1998-02-08 Perforation 2624.60 2624.90 80
1998-02-09 Remedial Casing Cementing 2623.00 2624.90 0
1998-02-14 Acid Treatment 2609.00 2610.90 0
1998-02-14 Cement Squeeze 2609.00 2610.90 0
1998-02-22 Perforation 2615.00 2619.00 3
1997-04-01 Perforation 2931.50 2934.00 13
1998-03-03 Fracture 2615.00 2619.00 0
1998-10-07 Perforation 1780.50 1780.80 24
1998-10-07 Perforation 1750.50 1750.80 24
1998-10-07 Cement Squeeze 1750.50 1780.80 0
1998-10-15 Perforation 1763.00 1767.00 3
1998-10-19 Acid Treatment 1763.00 1767.00 0
2000-06-07 Cement Squeeze 1763.00 1767.00 0
2000-06-14 Perforation 2615.00 2619.00 0
2000-06-17 Packing Device Capped w/Cement 2595.00 2603.00 0
2000-06-17 Packing Device Capped w/Cement 1741.00 1749.30 0
1997-04-01 Perforation 2941.50 2944.00 13
1997-06-12 Cement Squeeze 2920.50 2927.00 0
1997-06-12 Cement Squeeze 2931.50 2934.00 0
1997-06-12 Cement Squeeze 2941.50 2944.00 0
1997-06-20 Perforation 2920.00 2922.00 4
1997-06-22 Acid Treatment 2920.00 2922.00 0
1998-02-04 Packing Device Capped w/Cement 2898.00 2910.00 0

For data sources see[5]



References