X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445103104000

Well Details

Well ID: 0445103104000
Loading map...
Location: 00/04-31-044-10W5/0
Location Alias: 00/04-31-44-10 W5M
Location Alias 2: 00/04-31-044-10 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 10
Section: 31
County/Municipality: O'Chiese 203
Well Name: BELLATRIX HZ PEMBINA 4-31-44-10
Operator Name: Bellatrix Exploration Ltd.
License Number: 0461442
License Date: 2013-11-26
License Status: Issued
Spud Date: 2014-03-01
Final Drill Date: 2014-03-15
Well Total Depth: 3614.00 m
Surface Hole Latitude: 52.844333
Surface Hole Longitude: -115.445339

For data sources see[1][2]

Well History

Date Event
2013-11-26 Obtained License
2014-03-03 Surface Casing Operation Performed
2014-03-07 Intermediate Casing Operation Performed
2014-03-08 Direction Drilling Operation Performed - Deviate
2014-03-10 Direction Drilling Operation Performed - Horizontal
2014-03-15 Finished Drilling
2014-03-15 Well Log Performed
2014-03-15 Well Mode changed to Drilled and Cased
2014-03-17 Production Casing Operation Performed
2014-03-18 Rig Released
2014-03-20 Well Log Performed
2014-03-31 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-31 Perforation Treatment Performed - Open-Hole Completion
2014-04-01 Perforation Treatment Performed - Multi-Stage Fracture
2014-04-02 Well Began Production
2014-04-02 Well Fluid changed to Crude Oil
2014-04-02 Well Mode changed to Flowing
2016-02-12 Well Fluid changed to Crude Oil
2016-02-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-01 Chinook Drilling Inc. 10 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-03-08 1707.00 Deviate (5 - 79 degrees)
2014-03-10 2192.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-31 Open Hole/Barefoot Completion 3609.00 3614.00 0
2014-03-31 Multi-Stage Fracture 2953.80 2953.90 0
2014-03-31 Multi-Stage Fracture 2870.50 2870.60 0
2014-03-31 Multi-Stage Fracture 2787.30 2787.40 0
2014-03-31 Multi-Stage Fracture 2717.60 2717.70 0
2014-03-31 Multi-Stage Fracture 2634.40 2634.50 0
2014-03-31 Multi-Stage Fracture 2551.10 2551.20 0
2014-04-01 Multi-Stage Fracture 2481.40 2481.50 0
2014-04-01 Multi-Stage Fracture 2398.20 2398.30 0
2014-04-01 Multi-Stage Fracture 2328.60 2328.70 0
2014-03-31 Multi-Stage Fracture 3584.20 3584.30 0
2014-03-31 Multi-Stage Fracture 3507.80 3507.90 0
2014-03-31 Multi-Stage Fracture 3426.20 3426.30 0
2014-03-31 Multi-Stage Fracture 3342.90 3343.00 0
2014-03-31 Multi-Stage Fracture 3273.20 3273.30 0
2014-03-31 Multi-Stage Fracture 3190.00 3190.10 0
2014-03-31 Multi-Stage Fracture 3106.70 3106.80 0
2014-03-31 Multi-Stage Fracture 3037.00 3037.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-31 2014-04-01 2,048 3,139 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 5.0905 N/A
water Not Available 100 81.0546 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 3.7326 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 9.8938 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.4981 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0112 N/A
dibromoacetonitrile 3252-43-5 100 0.0112 N/A
non-hazardous ingredients Not Available 100 0.0112 N/A
polyethylene glycol 25322-68-3 100 0.0112 N/A
sodium bromide 7647-15-6 100 0.0112 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.016 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1826 N/A
water Not Available 100 0.1826 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0405 N/A
propylene glycol 57-55-6 100 0.0405 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0648 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0864 N/A
non-hazardous ingredients Not Available 100 0.0856 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.052 N/A
aminofunctional polymer 8985 100 0.052 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.052 N/A
isopropanol 67-63-0 100 0.052 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-21 2014-03-27 Central Water Distribution Facility 294
2014-03-23 2014-03-25 Recycled Fracturing Water (treated at well site) 613
2014-03-24 2014-03-24 Central Water Distribution Facility 60
2014-03-27 2014-03-27 Central Water Distribution Facility 176
2014-03-23 2014-03-24 Surface Water - River 2424

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6404 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8431 0.0 0.0 0.0
2019 8514 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-18 No Incident Encountered 0.00 0.00
2014-04-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References