X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445102507000

Well Details

Well ID: 0445102507000
Loading map...
Location: 00/07-25-044-10W5/0
Location Alias: 00/07-25-44-10 W5M
Location Alias 2: 00/07-25-044-10 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 10
Section: 25
County/Municipality: O'Chiese 203
Well Name: DEKALB O'CHIESE 7-25-44-10
Operator Name: Dundee Energy Limited
License Number: 0086943
License Date: 1980-11-10
License Status: Re-Entered
Spud Date: 1980-11-22
Final Drill Date: 1981-02-19
Well Total Depth: 3718.00 m
Surface Hole Latitude: 52.820060
Surface Hole Longitude: -115.316554

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-10 Obtained License
1980-11-22 Lost Circulation Occurred
1980-12-25 Kick Occurred
1981-01-25 Production Casing Operation Performed
1981-02-03 Drill Stem Test Performed
1981-02-19 Finished Drilling
1981-02-24 Drill Stem Test Performed
1981-02-26 Drill Stem Test Performed
1981-05-12 Perforation Treatment Performed - Jet Perforation
1981-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-07-05 Perforation Treatment Performed - Jet Perforation
1981-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-17 Perforation Treatment Performed - Cement Squeeze
1981-07-18 Perforation Treatment Performed - Jet Perforation
1981-07-28 Perforation Treatment Performed - Fractured
1981-08-07 Well Mode changed to Drilled and Cased
1999-12-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-29 Plug Back Performed
1999-12-29 Well Fluid changed to Gas
1999-12-29 Well Mode changed to Testing
1999-12-30 Well Abandoned
1999-12-30 Well Fluid changed to Gas
1999-12-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-05-12 Perforation 2667.50 2673.00 10
1981-06-03 Acid Treatment 2667.50 2673.00 0
1981-07-03 Packing Device Capped w/Cement 2507.00 2514.00 0
1981-07-05 Perforation 2344.00 2346.50 13
1981-07-08 Acid Treatment 2344.00 2346.50 0
1981-07-17 Cement Squeeze 2344.00 2346.50 0
1981-07-18 Perforation 1985.00 1989.00 13
1981-07-28 Fracture 1985.00 1989.00 0
1999-12-29 Packing Device Capped w/Cement 1967.00 1975.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 88 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-11-22 Lost Circulation 129.00 164.00
1980-12-25 Kick 2350.00 2350.00

For data sources see[6]

References