X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445080906000

Well Details

Well ID: 0445080906000
Loading map...
Location: 00/06-09-044-08W5/0
Location Alias: 00/06-09-44-08 W5M
Location Alias 2: 00/06-09-044-08 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 08
Section: 09
County/Municipality: Clearwater County
Well Name: VERMILION WILLGR 6-9-44-8
Operator Name: Vermilion Energy Inc.
License Number: 0249146
License Date: 2001-01-16
License Status: Abandoned
Spud Date: 2001-02-03
Final Drill Date: 2001-02-22
Well Total Depth: 2688.00 m
Surface Hole Latitude: 52.778319
Surface Hole Longitude: -115.101952

For data sources see[1][2]

Well History

Date Event
2001-01-16 Obtained License
2001-02-05 Surface Casing Operation Performed
2001-02-22 Finished Drilling
2001-02-22 Well Log Performed
2001-02-25 Drill Stem Test Performed
2001-02-28 Drill Stem Test Performed
2001-03-01 Production Casing Operation Performed
2001-03-03 Perforation Treatment Performed - Jet Perforation
2001-03-04 Perforation Treatment Performed - Jet Perforation
2001-03-05 Well Log Performed
2001-03-06 Perforation Treatment Performed - Jet Perforation
2001-03-06 Perforation Treatment Performed - Remedial Casing
2001-03-07 Rig Released
2001-03-07 Well Mode changed to Drilled and Cased
2001-03-15 Well Log Performed
2001-03-27 Well Log Performed
2001-03-30 Perforation Treatment Performed - Jet Perforation
2001-03-30 Well Log Performed
2001-03-31 Well Log Performed
2001-04-01 Perforation Treatment Performed - Jet Perforation
2001-04-02 Well Log Performed
2001-04-03 Well Log Performed
2001-04-04 Perforation Treatment Performed - Remedial Casing
2001-04-05 Well Log Performed
2001-04-06 Perforation Treatment Performed - Remedial Casing
2001-04-08 Liner Casing Operation Performed
2001-04-15 Well Log Performed
2001-04-18 Perforation Treatment Performed - Remedial Casing
2007-02-06 Perforation Treatment Performed - Jet Perforation
2007-02-07 Perforation Treatment Performed - Fractured
2011-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-06 Plug Back Performed
2011-12-06 Well Mode changed to Abandoned Zone
2011-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-07 Plug Back Performed
2011-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-08 Plug Back Performed
2011-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-09 Perforation Treatment Performed - Jet Perforation
2011-12-09 Plug Back Performed
2011-12-09 Well Log Performed
2011-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-12 Perforation Treatment Performed - Cement Squeeze
2011-12-12 Perforation Treatment Performed - Jet Perforation
2011-12-12 Plug Back Performed
2011-12-12 Well Log Performed
2011-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-14 Plug Back Performed
2011-12-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-03 Perforation 1800.00 1801.00 14
2001-04-06 Remedial Casing Cementing 850.00 851.00 0
2001-04-06 Remedial Casing Cementing 565.00 566.00 0
2001-04-18 Remedial Casing Cementing 1775.00 1801.00 0
2007-02-06 Perforation 2250.00 2256.00 17
2007-02-07 Fracture 2250.00 2256.00 0
2011-12-06 Packing Device Capped w/Cement 2237.00 2245.00 0
2011-12-07 Packing Device Capped w/Cement 2125.00 2133.00 0
2011-12-07 Packing Device Capped w/Cement 1761.00 1769.00 0
2011-12-08 Packing Device Capped w/Cement 1312.00 1320.00 0
2011-12-08 Packing Device Capped w/Cement 1010.00 1018.00 0
2001-03-04 Perforation 565.00 566.00 14
2011-12-09 Packing Device Capped w/Cement 835.00 843.00 0
2011-12-09 Perforation 660.00 661.00 14
2011-12-12 Packing Device Capped w/Cement 647.00 655.00 0
2011-12-12 Perforation 625.00 626.00 14
2011-12-12 Cement Squeeze 625.00 626.00 0
2011-12-14 Packing Device Capped w/Cement 457.00 465.00 0
2001-03-06 Perforation 470.00 471.00 14
2001-03-06 Remedial Casing Cementing 470.00 471.00 0
2001-03-30 Perforation 850.00 851.00 14
2001-03-30 Perforation 1775.00 1776.00 14
2001-03-30 Perforation 1325.00 1326.00 14
2001-04-01 Perforation 1025.00 1026.00 14
2001-04-04 Remedial Casing Cementing 1025.00 1326.00 0

For data sources see[4]



References