X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445080508000

Well Details

Well ID: 0445080508000
Loading map...
Location: 00/08-05-044-08W5/0
Location Alias: 00/08-05-44-08 W5M
Location Alias 2: 00/08-05-044-08 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 08
Section: 05
County/Municipality: Clearwater County
Well Name: AMOCO WILLGR 8-5-44-8
Operator Name: Obsidian Energy Ltd.
License Number: 0056139
License Date: 1975-12-09
License Status: Issued
Spud Date: 1975-12-11
Final Drill Date: 1975-12-19
Well Total Depth: 1825.10 m
Surface Hole Latitude: 52.762260
Surface Hole Longitude: -115.113677

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-09 Obtained License
1975-12-19 Finished Drilling
1975-12-19 Well Mode changed to Drilled and Cased
1975-12-20 Production Casing Operation Performed
1976-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-03 Perforation Treatment Performed - Fractured
1976-01-03 Perforation Treatment Performed - Jet Perforation
1976-01-18 Well Began Production
1976-01-18 Well Fluid changed to Crude Oil
1976-01-18 Well Mode changed to Flowing
1985-07-18 Perforation Treatment Performed - Fractured
1985-07-18 Perforation Treatment Performed - Jet Perforation
1985-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-17 Well Log Performed
2001-09-02 Well Log Performed
2001-09-11 Well Fluid changed to Crude Oil
2001-09-11 Well Mode changed to Pumping
2001-09-27 Perforation Treatment Performed - Jet Perforation
2001-09-27 Well Log Performed
2001-09-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-03 Perforation 1793.70 1795.30 3
1985-07-19 Acid Treatment 1793.70 1803.40 0
2001-09-27 Perforation 393.00 394.00 17
2001-09-28 Remedial Casing Cementing 393.00 394.00 0
1976-01-03 Perforation 1796.80 1797.40 3
1976-01-03 Perforation 1799.80 1801.10 3
1976-01-03 Perforation 1802.30 1803.20 3
1976-01-03 Acid Treatment 1793.70 1803.20 0
1976-01-03 Fracture 1793.70 1803.20 0
1985-07-18 Perforation 1796.80 1797.40 14
1985-07-18 Perforation 1799.80 1803.40 14
1985-07-18 Fracture 1793.70 1803.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 8047 0.0 0.0 0.0
1977 8060 0.0 0.0 0.0
1978 8699 0.0 0.0 0.0
1979 7820 0.0 0.0 0.0
1980 4562 0.0 0.0 0.0
1981 6504 0.0 0.0 0.0
1982 8107 0.0 0.0 0.0
1983 8639 0.0 0.0 0.0
1984 8394 0.0 0.0 0.0
1985 8172 0.0 0.0 0.0
1986 8204 0.0 0.0 0.0
1987 7664 0.0 0.0 0.0
1988 8177 0.0 0.0 0.0
1989 8653 0.0 0.0 0.0
1990 8393 0.0 0.0 0.0
1991 8554 0.0 0.0 0.0
1992 8670 0.0 0.0 0.0
1993 7530 0.0 0.0 0.0
1994 7866 0.0 0.0 0.0
1995 8285 0.0 0.0 0.0
1996 8207 0.0 0.0 0.0
1997 7592 0.0 0.0 0.0
1998 8520 0.0 0.0 0.0
1999 8519 0.0 0.0 0.0
2000 8614 0.0 0.0 0.0
2001 6898 0.0 0.0 0.0
2002 8677 0.0 0.0 0.0
2003 8198 0.0 0.0 0.0
2004 8711 0.0 0.0 0.0
2005 8519 0.0 0.0 0.0
2006 6648 0.0 0.0 0.0
2007 7584 0.0 0.0 0.0
2008 8315 0.0 0.0 0.0
2009 8063 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8365 0.0 0.0 0.0
2012 8585 0.0 0.0 0.0
2013 8537 0.0 0.0 0.0
2014 8546 0.0 0.0 0.0
2015 6372 0.0 0.0 0.0
2016 8569 0.0 0.0 0.0
2017 8399 0.0 0.0 0.0
2018 7931 0.0 0.0 0.0
2019 5930 0.0 0.0 0.0
2020 1870 0.0 0.0 0.0

For data sources see[5]

References