If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445053303000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.845095,"lon":-114.666734,"icon":""}]} |
Location: 00/03-33-044-05W5/0 | |
Location Alias: 00/03-33-44-05 W5M | |
Location Alias 2: 00/03-33-044-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 05 | |
Section: 33 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: WHITECAP PEMBINA 3-33-44-5 | |
Operator Name: Whitecap Resources Inc. | |
License Number: 0448192 | |
License Date: 2012-08-31 | |
License Status: Issued | |
Spud Date: 2012-09-28 | |
Final Drill Date: 2012-10-05 | |
Well Total Depth: 3160.00 m | |
Surface Hole Latitude: 52.845095 | |
Surface Hole Longitude: -114.666734 |
Date | Event |
---|---|
2012-08-31 | Obtained License |
2012-09-29 | Surface Casing Operation Performed |
2012-09-29 | Well Log Performed |
2012-09-30 | Direction Drilling Operation Performed - Deviate |
2012-10-02 | Direction Drilling Operation Performed - Horizontal |
2012-10-02 | Intermediate Casing Operation Performed |
2012-10-05 | Finished Drilling |
2012-10-05 | Well Mode changed to Drilled and Cased |
2012-10-06 | Liner Casing Operation Performed |
2012-10-07 | Rig Released |
2012-10-17 | Well Log Performed |
2012-10-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-22 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-23 | Well Began Production |
2012-10-23 | Well Fluid changed to Crude Oil |
2012-10-23 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-28 | Nabors Drilling Limited | 12 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-30 | 1433.80 | Deviate (5 - 79 degrees) |
2012-10-02 | 1827.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-22 | Open Hole/Barefoot Completion | 3155.00 | 3160.00 | 0 |
2012-10-22 | Multi-Stage Fracture | 2527.50 | 2527.60 | 0 |
2012-10-22 | Multi-Stage Fracture | 2458.00 | 2458.10 | 0 |
2012-10-22 | Multi-Stage Fracture | 2388.40 | 2388.50 | 0 |
2012-10-22 | Multi-Stage Fracture | 2318.80 | 2318.90 | 0 |
2012-10-22 | Multi-Stage Fracture | 2236.30 | 2236.40 | 0 |
2012-10-22 | Multi-Stage Fracture | 2166.70 | 2166.80 | 0 |
2012-10-22 | Multi-Stage Fracture | 2097.20 | 2097.30 | 0 |
2012-10-22 | Multi-Stage Fracture | 2014.70 | 2014.80 | 0 |
2012-10-22 | Multi-Stage Fracture | 1945.20 | 1945.30 | 0 |
2012-10-22 | Multi-Stage Fracture | 1875.00 | 1875.10 | 0 |
2012-10-22 | Multi-Stage Fracture | 3118.00 | 3118.10 | 0 |
2012-10-22 | Multi-Stage Fracture | 3043.80 | 3043.90 | 0 |
2012-10-22 | Multi-Stage Fracture | 2974.20 | 2974.30 | 0 |
2012-10-22 | Multi-Stage Fracture | 2891.70 | 2891.80 | 0 |
2012-10-22 | Multi-Stage Fracture | 2820.90 | 2821.00 | 0 |
2012-10-22 | Multi-Stage Fracture | 2749.10 | 2749.20 | 0 |
2012-10-22 | Multi-Stage Fracture | 2679.60 | 2679.70 | 0 |
2012-10-22 | Multi-Stage Fracture | 2610.00 | 2610.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1500 | 0.0 | 0.0 | 0.0 |
2013 | 8680 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8375 | 0.0 | 0.0 | 0.0 |
2016 | 8735 | 0.0 | 0.0 | 0.0 |
2017 | 8521 | 0.0 | 0.0 | 0.0 |
2018 | 8531 | 0.0 | 0.0 | 0.0 |
2019 | 8639 | 0.0 | 0.0 | 0.0 |
2020 | 2050 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-02 | No Incident Encountered | 0.00 | 0.00 |
2012-10-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]