X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444223615000

Well Details

Well ID: 0444223615000
Loading map...
Location: 00/15-36-044-22W4/0
Location Alias: 00/15-36-44-22 W4M
Location Alias 2: 00/15-36-044-22 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 36
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL MALMO 15-36MU-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0003207
License Date: 1951-07-18
License Status: Abandoned
Spud Date: 1951-08-12
Final Drill Date: 1951-09-25
Well Total Depth: 1510.30 m
Surface Hole Latitude: 52.841815
Surface Hole Longitude: -113.060532

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-07-18 Obtained License
1951-09-02 Drill Stem Test Performed
1951-09-03 Drill Stem Test Performed
1951-09-04 Drill Stem Test Performed
1951-09-07 Drill Stem Test Performed
1951-09-08 Drill Stem Test Performed
1951-09-09 Drill Stem Test Performed
1951-09-12 Liner Casing Operation Performed
1951-09-18 Drill Stem Test Performed
1951-09-19 Drill Stem Test Performed
1951-09-21 Drill Stem Test Performed
1951-09-22 Drill Stem Test Performed
1951-09-24 Drill Stem Test Performed
1951-09-25 Drill Stem Test Performed
1951-09-25 Finished Drilling
1951-09-25 Well Mode changed to Drilled and Cased
1951-09-29 Perforation Treatment Performed - Bullet Perforation
1951-09-30 Drill Stem Test Performed
1951-09-30 Perforation Treatment Performed - Bullet Perforation
1951-09-30 Perforation Treatment Performed - Jet Perforation
1951-10-02 Perforation Treatment Performed - Acid Wash - No Pressure
1951-10-02 Well Began Production
1951-10-02 Well Fluid changed to Crude Oil
1951-10-02 Well Mode changed to Flowing
1952-01-15 Perforation Treatment Performed - Bullet Perforation
1952-01-17 Well Fluid changed to Crude Oil
1952-01-17 Well Mode changed to Flowing
1959-06-25 Perforation Treatment Performed - Cement Squeeze
1959-06-30 Perforation Treatment Performed - Jet Perforation
1959-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-04 Perforation Treatment Performed - Cement Squeeze
1959-07-04 Perforation Treatment Performed - Jet Perforation
1973-07-23 Perforation Treatment Performed - Cement Squeeze
1973-07-31 Perforation Treatment Performed - Jet Perforation
1973-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-02-12 Well Fluid changed to Crude Oil
1975-02-12 Well Mode changed to Suspended
1975-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-07-11 Well Fluid changed to Crude Oil
1975-07-11 Well Mode changed to Abandoned Zone
1989-09-07 Well Log Performed
1989-09-08 Perforation Treatment Performed - Cement Squeeze
1989-09-09 Well Log Performed
1989-09-10 Perforation Treatment Performed - Jet Perforation
1992-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-01-05 Plug Back Performed
1992-10-03 Well Log Performed
2013-09-08 Well Log Performed
2013-09-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-29 Bullet Perforation 1489.90 1490.20 10
1959-07-04 Cement Squeeze 1492.60 1495.70 0
1959-07-04 Perforation 1488.00 1491.10 13
1959-07-04 Acid Treatment 1488.00 1491.10 0
1973-07-23 Cement Squeeze 1411.20 1417.30 0
1973-07-31 Perforation 1404.50 1405.10 13
1973-08-01 Acid Treatment 1404.50 1405.10 0
1973-08-23 Acid Treatment 1404.50 1405.10 0
1975-07-11 Packing Device Capped w/Cement 1412.70 1420.40 0
1989-09-08 Cement Squeeze 1404.50 1405.10 0
1989-09-10 Perforation 1398.90 1399.60 13
1951-09-30 Bullet Perforation 1480.70 1481.00 13
1992-01-05 Packing Device Capped w/Cement 1385.00 1395.30 0
1951-09-30 Perforation 1480.70 1489.90 26
1951-10-02 Acid Wash 1480.70 1489.90 0
1952-01-15 Bullet Perforation 1408.20 1420.40 0
1959-06-25 Cement Squeeze 1408.20 1490.20 0
1959-06-30 Perforation 1489.60 1495.70 13
1959-06-30 Perforation 1411.20 1417.30 13
1959-07-01 Acid Treatment 1489.60 1495.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1898 0.0 0.0 0.0
1968 2644 0.0 0.0 0.0
1969 3164 0.0 0.0 0.0
1970 1557 0.0 0.0 0.0
1971 2756 0.0 0.0 0.0
1972 3344 0.0 0.0 0.0
1973 5855 0.0 0.0 0.0

For data sources see[5]

References