X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444223611000

Well Details

Well ID: 0444223611000
Loading map...
Location: 00/11-36-044-22W4/0
Location Alias: 00/11-36-44-22 W4M
Location Alias 2: 00/11-36-044-22 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 36
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL NEW NORWAY 11-36-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0003732
License Date: 1951-11-07
License Status: Suspension
Spud Date: 1951-11-21
Final Drill Date: 1951-12-26
Well Total Depth: 1509.70 m
Surface Hole Latitude: 52.838133
Surface Hole Longitude: -113.066167

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-07 Obtained License
1951-12-22 Production Casing Operation Performed
1951-12-26 Finished Drilling
1951-12-26 Perforation Treatment Performed - Open-Hole Completion
1951-12-26 Well Mode changed to Drilled and Cased
1951-12-27 Well Began Production
1951-12-27 Well Fluid changed to Crude Oil
1951-12-27 Well Mode changed to Flowing
1961-09-27 Perforation Treatment Performed - Cement Squeeze
1961-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-10-01 Perforation Treatment Performed - Cement Squeeze
1961-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-10-05 Perforation Treatment Performed - Jet Perforation
1967-02-14 Well Fluid changed to Crude Oil
1967-02-14 Well Mode changed to Pumping
1973-07-08 Perforation Treatment Performed - Jet Perforation
1973-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-15 Perforation Treatment Performed - Cement Squeeze
1982-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-15 Perforation Treatment Performed - Jet Perforation
1984-03-15 Perforation Treatment Performed - Cement Squeeze
1984-03-15 Well Log Performed
1984-03-16 Perforation Treatment Performed - Jet Perforation
1984-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-10 Perforation Treatment Performed - Cement Squeeze
1985-01-11 Perforation Treatment Performed - Jet Perforation
1985-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-06 Well Log Performed
1991-12-10 Well Log Performed
1991-12-12 Well Log Performed
1991-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-12-13 Perforation Treatment Performed - Jet Perforation
1991-12-13 Plug Back Performed
1991-12-13 Well Fluid changed to Crude Oil
1991-12-13 Well Mode changed to Abandoned Zone
1991-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-12-18 Plug Back Performed
1991-12-18 Well Log Performed
1991-12-19 Perforation Treatment Performed - Jet Perforation
1991-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-20 Well Log Performed
1992-05-21 Perforation Treatment Performed - Jet Perforation
1999-04-19 Perforation Treatment Performed - Jet Perforation
1999-04-19 Well Log Performed
1999-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-26 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-12-26 Open Hole/Barefoot Completion 1496.60 1509.70 0
1982-09-15 Perforation 1505.10 1506.30 13
1982-09-15 Acid Treatment 1505.10 1506.60 0
1984-03-15 Cement Squeeze 1505.10 1506.60 0
1984-03-16 Perforation 1499.00 1501.00 13
1984-03-17 Acid Treatment 1499.00 1501.00 0
1985-01-10 Cement Squeeze 1499.00 1501.00 0
1985-01-11 Perforation 1497.00 1498.30 13
1985-01-12 Acid Treatment 1497.00 1498.30 0
1991-12-13 Packing Device Capped w/Cement 1472.00 1482.00 0
1991-12-13 Perforation 1414.30 1416.10 13
1961-09-27 Cement Squeeze 1496.60 1509.70 0
1991-12-18 Packing Device Capped w/Cement 1402.60 1410.80 0
1991-12-19 Perforation 1391.50 1393.00 13
1991-12-20 Acid Treatment 1391.50 1393.00 0
1992-05-06 Acid Treatment 1391.50 1393.00 0
1992-05-21 Perforation 1358.50 1360.00 16
1999-04-19 Perforation 1391.40 1395.00 14
1999-04-20 Acid Treatment 1391.40 1395.00 0
2011-09-26 Packing Device Capped w/Cement 1371.00 1379.00 0
1961-09-30 Acid Treatment 1496.60 1509.70 0
1961-10-01 Cement Squeeze 1496.60 1509.70 0
1961-10-05 Perforation 1505.10 1506.60 13
1961-10-05 Acid Treatment 1505.10 1506.60 0
1973-07-08 Perforation 1501.70 1503.90 7
1973-07-10 Acid Treatment 1501.70 1503.90 0
1982-07-15 Cement Squeeze 1501.70 1503.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3031 0.0 0.0 0.0
1968 4062 0.0 0.0 0.0
1969 3718 0.0 0.0 0.0
1970 2505 0.0 0.0 0.0
1971 2842 0.0 0.0 0.0
1972 3864 0.0 0.0 0.0
1973 7377 0.0 0.0 0.0
1974 6998 0.0 0.0 0.0
1975 8489 0.0 0.0 0.0
1976 8187 0.0 0.0 0.0
1977 8640 0.0 0.0 0.0
1978 8287 0.0 0.0 0.0
1979 8295 0.0 0.0 0.0
1980 7289 0.0 0.0 0.0
1981 8524 0.0 0.0 0.0
1982 6834 0.0 0.0 0.0
1983 6465 0.0 0.0 0.0
1984 5088 0.0 0.0 0.0
1985 5603 0.0 0.0 0.0
1986 5442 0.0 0.0 0.0
1987 8688 0.0 0.0 0.0
1988 8219 0.0 0.0 0.0
1989 6736 0.0 0.0 0.0
1990 8393 0.0 0.0 0.0
1991 7730 0.0 0.0 0.0
1992 48 0.0 0.0 0.0

For data sources see[5]

References