X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444222303002

Well Details

Well ID: 0444222303002
Loading map...
Location: 00/03-23-044-22W4/2
Location Alias: 00/03-23-44-22 W4M
Location Alias 2: 00/03-23-044-22 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 23
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL MALMO 3-23-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0005453
License Date: 1952-10-08
License Status: Abandoned
Spud Date: 1952-10-24
Final Drill Date: 1952-11-28
Well Total Depth: 1611.50 m
Surface Hole Latitude: 52.800877
Surface Hole Longitude: -113.090069

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-10-08 Obtained License
1952-11-01 Drill Stem Test Performed
1952-11-17 Drill Stem Test Performed
1952-11-21 Drill Stem Test Performed
1952-11-22 Drill Stem Test Performed
1952-11-24 Drill Stem Test Performed
1952-11-28 Drill Stem Test Performed
1952-11-28 Finished Drilling
1952-11-28 Well Mode changed to Drilled and Cased
1952-11-29 Production Casing Operation Performed
1952-12-01 Perforation Treatment Performed - Selective Bullet Perforations
1952-12-14 Drill Stem Test Performed
1952-12-14 Perforation Treatment Performed - Bullet Perforation
1952-12-14 Perforation Treatment Performed - Jet Perforation
1952-12-14 Perforation Treatment Performed - Open-Hole Completion
1952-12-28 Well Began Production
1952-12-28 Well Fluid changed to Crude Oil
1952-12-28 Well Mode changed to Flowing
1957-08-30 Well Fluid changed to Crude Oil
1957-08-30 Well Mode changed to Pumping
1960-01-18 Well Fluid changed to Crude Oil
1960-01-18 Well Mode changed to Suspended
1963-10-06 Perforation Treatment Performed - Cement Squeeze
1963-10-07 Perforation Treatment Performed - Cement Squeeze
1963-10-07 Perforation Treatment Performed - Jet Perforation
1963-10-07 Well Fluid changed to Crude Oil
1963-10-07 Well Mode changed to Abandoned Zone
1964-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-06 Well Log Performed
1989-11-08 Well Log Performed
1989-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-09 Plug Back Performed
1989-11-10 Perforation Treatment Performed - Jet Perforation
1989-11-26 Well Log Performed
1989-11-27 Perforation Treatment Performed - Jet Perforation
1989-12-01 Well Log Performed
1990-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-25 Well Log Performed
1990-09-26 Perforation Treatment Performed - Jet Perforation
1993-10-20 Well Log Performed
1993-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-21 Plug Back Performed
1993-10-23 Well Log Performed
1993-10-25 Well Log Performed
1993-10-26 Perforation Treatment Performed - Jet Perforation
2006-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-02 Perforation Treatment Performed - Cement Plug
2006-06-02 Plug Back Performed
2006-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-03 Perforation Treatment Performed - Jet Perforation
2006-06-03 Perforation Treatment Performed - Remedial Casing
2006-06-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-12-01 Selective Bullet Perforations 1432.60 1434.70 0
1989-11-10 Perforation 1521.00 1525.00 13
1989-11-27 Perforation 1535.00 1537.00 13
1990-05-07 Packing Device Capped w/Cement 1530.00 1532.00 0
1990-09-26 Perforation 1514.50 1516.00 13
1990-09-26 Perforation 1517.50 1519.00 13
1993-10-21 Packing Device Capped w/Cement 1502.00 1510.00 0
1993-10-26 Perforation 1428.00 1430.00 13
2006-06-02 Packing Device Capped w/Cement 1412.00 1420.00 0
2006-06-02 Cement Plug 1150.60 1200.00 0
2006-06-03 Perforation 394.00 397.00 13
1952-12-14 Open Hole/Barefoot Completion 1607.80 1611.50 0
2006-06-03 Remedial Casing Cementing 394.00 397.00 0
2006-06-03 Packing Device Capped w/Cement 371.00 386.00 0
1952-12-14 Perforation 1432.60 1434.70 7
1952-12-14 Bullet Perforation 1432.60 1434.70 13
1963-10-06 Cement Squeeze 1607.80 1611.50 0
1963-10-07 Cement Squeeze 1432.60 1434.70 0
1963-10-07 Perforation 1601.70 1603.20 7
1964-01-25 Acid Treatment 1601.70 1603.20 0
1989-11-09 Packing Device Capped w/Cement 1579.00 1587.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References