X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444221414020

Well Details

Well ID: 0444221414020
Loading map...
Location: 02/14-14-044-22W4/0
Location Alias: 02/14-14-44-22 W4M
Location Alias 2: 02/14-14-044-22 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 14
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL ET AL MALMO 14A-14-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0006860
License Date: 1953-08-04
License Status: RecCertified
Spud Date: 1953-08-08
Final Drill Date: 1953-08-27
Well Total Depth: 1553.60 m
Surface Hole Latitude: 52.798415
Surface Hole Longitude: -113.091989

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-08-04 Obtained License
1953-08-27 Drill Stem Test Performed
1953-08-27 Finished Drilling
1953-08-27 Well Mode changed to Drilled and Cased
1953-08-28 Production Casing Operation Performed
1953-08-31 Perforation Treatment Performed - Jet Perforation
1953-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-09-03 Drill Stem Test Performed
1953-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-09-04 Perforation Treatment Performed - Cement Squeeze
1953-09-30 Drill Stem Test Performed
1953-09-30 Perforation Treatment Performed - Jet Perforation
1953-10-01 Drill Stem Test Performed
1953-10-02 Perforation Treatment Performed - Jet Perforation
1953-10-03 Perforation Treatment Performed - Cement Squeeze
1953-10-09 Perforation Treatment Performed - Jet Perforation
1953-10-11 Drill Stem Test Performed
1953-10-11 Perforation Treatment Performed - Jet Perforation
1953-10-13 Drill Stem Test Performed
1953-10-14 Drill Stem Test Performed
1953-10-14 Perforation Treatment Performed - Bullet Perforation
1953-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-10-19 Perforation Treatment Performed - Bullet Perforation
1953-10-19 Perforation Treatment Performed - Cement Squeeze
1953-10-21 Perforation Treatment Performed - Bullet Perforation
1953-10-22 Perforation Treatment Performed - Bullet Perforation
1953-11-25 Well Began Production
1953-11-25 Well Fluid changed to Crude Oil
1953-11-25 Well Mode changed to Pumping
1961-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1961-11-19 Well Fluid changed to Crude Oil
1961-11-19 Well Mode changed to Suspended
1990-07-11 Perforation Treatment Performed - Jet Perforation
1990-07-13 Perforation Treatment Performed - Jet Perforation
1990-07-13 Well Log Performed
1990-07-14 Well Log Performed
1990-07-15 Perforation Treatment Performed - Jet Perforation
1990-08-10 Well Fluid changed to Crude Oil
1990-08-10 Well Mode changed to Pumping
2001-01-01 Well Fluid changed to Crude Oil
2001-01-01 Well Mode changed to Suspended
2003-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-06 Plug Back Performed
2003-06-06 Well Fluid changed to Crude Oil
2003-06-06 Well Log Performed
2003-06-06 Well Mode changed to Abandoned Zone
2003-06-07 Perforation Treatment Performed - Jet Perforation
2003-06-07 Well Log Performed
2005-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-09 Plug Back Performed
2005-06-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-08-31 Perforation 1542.30 1545.60 13
1953-10-14 Bullet Perforation 1543.80 1544.40 10
1953-10-16 Acid Treatment 1543.80 1544.40 0
1953-10-19 Cement Squeeze 1543.80 1545.60 0
1953-10-19 Bullet Perforation 1439.00 1439.30 13
1953-10-21 Bullet Perforation 1438.70 1439.00 13
1953-10-22 Bullet Perforation 1438.40 1438.70 0
1961-11-19 Packing Device Capped w/Cement 1414.30 1414.30 0
1990-07-11 Perforation 1438.40 1439.30 13
1990-07-13 Perforation 1430.00 1432.00 13
1990-07-15 Perforation 1425.50 1427.50 13
1953-09-01 Acid Treatment 1542.30 1545.60 0
2003-06-06 Packing Device Capped w/Cement 1414.00 1422.00 0
2003-06-07 Perforation 1386.00 1387.50 17
2005-06-09 Packing Device Capped w/Cement 1369.00 1377.00 0
1953-09-03 Acid Treatment 1542.30 1545.60 0
1953-09-04 Cement Squeeze 1542.30 1545.60 0
1953-09-30 Perforation 1438.70 1439.30 7
1953-10-02 Perforation 1437.40 1438.70 7
1953-10-03 Cement Squeeze 1437.40 1438.70 0
1953-10-09 Perforation 1544.40 1545.60 10
1953-10-11 Perforation 1543.80 1544.40 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1990 3436 0.0 0.0 0.0
1991 3886 0.0 0.0 0.0

For data sources see[5]

References