X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444221105000

Well Details

Well ID: 0444221105000
Loading map...
Location: 00/05-11-044-22W4/0
Location Alias: 00/05-11-44-22 W4M
Location Alias 2: 00/05-11-044-22 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 11
County/Municipality: County of Wetaskiwin No. 10
Well Name: BEAVER LAKE MALMO 5-11L-44-22
Operator Name: Beaver Lake Resources Corporation
License Number: 0005293
License Date: 1952-09-12
License Status: Issued
Spud Date: 1952-10-03
Final Drill Date: 1952-11-05
Well Total Depth: 1607.80 m
Surface Hole Latitude: 52.776304
Surface Hole Longitude: -113.097281

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-12 Obtained License
1952-10-14 Drill Stem Test Performed
1952-10-22 Drill Stem Test Performed
1952-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-11-01 Perforation Treatment Performed - Jet Perforation
1952-11-05 Drill Stem Test Performed
1952-11-05 Finished Drilling
1952-11-05 Well Mode changed to Drilled and Cased
1952-11-06 Production Casing Operation Performed
1952-12-09 Well Began Production
1952-12-09 Well Fluid changed to Crude Oil
1952-12-09 Well Mode changed to Flowing
1953-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-11-22 Perforation Treatment Performed - Cement Squeeze
1953-12-11 Perforation Treatment Performed - Jet Perforation
1953-12-19 Perforation Treatment Performed - Jet Perforation
1953-12-20 Perforation Treatment Performed - Acid Wash - No Pressure
1954-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-06-22 Perforation Treatment Performed - Bullet Perforation
1954-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-18 Drill Stem Test Performed
1955-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-03-19 Perforation Treatment Performed - Cement Squeeze
1955-03-20 Well Fluid changed to Crude Oil
1955-03-20 Well Mode changed to Flowing
1955-06-01 Drill Stem Test Performed
1955-06-06 Drill Stem Test Performed
1955-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-06-07 Perforation Treatment Performed - Jet Perforation
1957-02-08 Well Fluid changed to Crude Oil
1957-02-08 Well Mode changed to Pumping
1990-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-22 Perforation Treatment Performed - Jet Perforation
1990-06-22 Plug Back Performed
1990-06-22 Well Fluid changed to Crude Oil
1990-06-22 Well Mode changed to Abandoned Zone
1990-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-11 Perforation Treatment Performed - Jet Perforation
1996-07-05 Well Log Performed
1996-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-11-01 Perforation 1595.00 1600.20 13
1953-12-19 Perforation 1541.10 1544.10 13
1953-12-19 Perforation 1545.30 1547.20 13
1953-12-20 Acid Wash 1541.10 1547.20 0
1954-05-08 Acid Treatment 1539.20 1547.20 0
1954-06-22 Bullet Perforation 1534.70 1539.20 10
1954-06-25 Acid Treatment 1534.70 1547.20 0
1954-12-14 Acid Treatment 1534.70 1547.20 0
1955-01-31 Acid Treatment 1595.00 1600.20 0
1955-02-07 Acid Treatment 1534.70 1600.20 0
1955-03-19 Cement Squeeze 1534.70 1547.20 0
1952-11-01 Perforation 1539.20 1544.10 13
1955-06-07 Perforation 1595.00 1600.20 13
1955-06-07 Acid Treatment 1595.00 1600.20 0
1990-06-22 Packing Device Capped w/Cement 1582.00 1590.00 0
1990-06-22 Perforation 1534.20 1537.20 13
1990-06-23 Acid Treatment 1534.20 1537.20 0
1993-08-11 Perforation 1514.00 1520.00 13
1996-07-09 Acid Treatment 1514.00 1520.00 0
1952-11-01 Perforation 1545.30 1547.20 13
1952-11-01 Acid Treatment 1539.20 1600.20 0
1952-11-01 Perforation 1532.50 1536.80 13
1952-11-01 Acid Treatment 1532.50 1600.20 0
1953-04-20 Acid Treatment 1595.00 1600.20 0
1953-11-22 Cement Squeeze 1532.50 1547.20 0
1953-12-11 Perforation 1595.00 1600.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8038 0.0 0.0 0.0
1968 8145 0.0 0.0 0.0
1969 7777 0.0 0.0 0.0
1970 8485 0.0 0.0 0.0
1971 8628 0.0 0.0 0.0
1972 8633 0.0 0.0 0.0
1973 8568 0.0 0.0 0.0
1974 8473 0.0 0.0 0.0
1975 8557 0.0 0.0 0.0
1976 8474 0.0 0.0 0.0
1977 8484 0.0 0.0 0.0
1978 7976 0.0 0.0 0.0
1979 6244 0.0 0.0 0.0
1980 7947 0.0 0.0 0.0
1981 624 0.0 0.0 0.0

For data sources see[5]

References