X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444181109000

Well Details

Well ID: 0444181109000
Loading map...
Location: 00/09-11-044-18W4/0
Location Alias: 00/09-11-44-18 W4M
Location Alias 2: 00/09-11-044-18 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 18
Section: 11
County/Municipality: Camrose County
Well Name: EMBER KELSEY 9-11-44-18
Operator Name: Ember Resources Inc.
License Number: 0086409
License Date: 1980-10-17
License Status: Abandoned
Spud Date: 1980-10-17
Final Drill Date: 1980-10-22
Well Total Depth: 1161.00 m
Surface Hole Latitude: 52.780593
Surface Hole Longitude: -112.500312

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-17 Obtained License
1980-10-22 Finished Drilling
1980-10-22 Well Mode changed to Drilled and Cased
1980-10-23 Drill Stem Test Performed
1980-10-24 Production Casing Operation Performed
1981-03-07 Perforation Treatment Performed - Jet Perforation
1981-03-16 Well Began Production
1981-03-16 Well Fluid changed to Gas
1981-03-16 Well Mode changed to Flowing
1986-03-01 Well Fluid changed to Gas
1986-03-01 Well Mode changed to Suspended
1987-09-30 Well Log Performed
1987-10-01 Perforation Treatment Performed - Jet Perforation
1987-11-26 Well Fluid changed to Gas
1987-11-26 Well Mode changed to Flowing
1990-05-14 Perforation Treatment Performed - Cement Squeeze
1990-05-14 Plug Back Performed
1990-05-14 Well Fluid changed to Gas
1990-05-14 Well Mode changed to Flowing
1990-05-17 Perforation Treatment Performed - Jet Perforation
1995-04-30 Well Fluid changed to Gas
1995-04-30 Well Mode changed to Suspended
1996-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-24 Perforation Treatment Performed - Jet Perforation
1996-09-24 Plug Back Performed
1996-09-24 Well Fluid changed to Gas
1996-09-24 Well Log Performed
1996-09-24 Well Mode changed to Abandoned Zone
2002-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-03 Plug Back Performed
2002-09-04 Well Log Performed
2002-09-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-07 Perforation 1067.00 1069.00 7
1987-10-01 Perforation 1053.00 1054.30 13
1987-10-01 Perforation 1067.00 1069.00 13
1990-05-14 Cement Squeeze 1053.00 1054.30 0
1990-05-17 Perforation 1067.00 1069.00 13
1996-09-24 Packing Device Capped w/Cement 1042.00 1050.00 0
1996-09-24 Perforation 920.00 921.00 13
2002-09-03 Packing Device Capped w/Cement 907.00 915.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3169 0.0 0.0 0.0
1982 2091 0.0 0.0 0.0
1983 1592 0.0 0.0 0.0
1984 4051 0.0 0.0 0.0
1985 2423 0.0 0.0 0.0
1986 253 0.0 0.0 0.0
1987 112 0.0 0.0 0.0
1988 4938 0.0 0.0 0.0
1989 862 0.0 0.0 0.0
1990 5461 0.0 0.0 0.0
1991 8545 0.0 0.0 0.0
1992 8646 0.0 0.0 0.0
1993 8187 0.0 0.0 0.0
1994 8286 0.0 0.0 0.0
1995 1717 0.0 0.0 0.0

For data sources see[5]

References