X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444162406000

Well Details

Well ID: 0444162406000
Loading map...
Location: 00/06-24-044-16W4/0
Location Alias: 00/06-24-44-16 W4M
Location Alias 2: 00/06-24-044-16 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 16
Section: 24
County/Municipality: Flagstaff County
Well Name: CABRE ET AL STROME 6-24-44-16
Operator Name: Enerplus Corporation
License Number: 0094332
License Date: 1982-01-07
License Status: RecCertified
Spud Date: 1982-01-12
Final Drill Date: 1982-01-20
Well Total Depth: 1093.00 m
Surface Hole Latitude: 52.805774
Surface Hole Longitude: -112.193743

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-01-07 Obtained License
1982-01-12 Lost Circulation Occurred
1982-01-13 Lost Circulation Occurred
1982-01-20 Finished Drilling
1982-01-21 Drill Stem Test Performed
1982-01-22 Drill Stem Test Performed
1982-01-23 Production Casing Operation Performed
1982-01-23 Well Mode changed to Drilled and Cased
1982-06-29 Perforation Treatment Performed - Jet Perforation
1983-07-28 Well Began Production
1983-07-28 Well Fluid changed to Gas
1983-07-28 Well Mode changed to Flowing
1985-09-20 Perforation Treatment Performed - Jet Perforation
1986-07-01 Well Fluid changed to Gas
1986-07-01 Well Mode changed to Suspended
1987-02-17 Well Log Performed
1987-08-11 Perforation Treatment Performed - Jet Perforation
1987-08-11 Well Log Performed
1987-08-12 Perforation Treatment Performed - Acid Wash - No Pressure
1987-08-12 Perforation Treatment Performed - Cement Squeeze
1987-08-13 Perforation Treatment Performed - Jet Perforation
1987-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-07-27 Plug Back Performed
1988-07-27 Well Fluid changed to Gas
1988-07-27 Well Mode changed to Abandoned Zone
1988-07-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-29 Perforation 979.30 980.30 13
1988-07-27 Packing Device Capped w/Cement 969.00 977.00 0
1985-09-20 Perforation 993.50 994.50 13
1987-08-11 Perforation 982.50 983.50 13
1987-08-12 Acid Wash 979.30 994.50 0
1987-08-12 Cement Squeeze 979.30 994.50 0
1987-08-13 Perforation 979.50 980.50 13
1987-08-14 Acid Treatment 979.50 980.50 0
1987-08-16 Acid Treatment 979.50 980.50 0
1987-08-20 Acid Treatment 979.50 980.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3551 0.0 0.0 0.0
1984 3746 0.0 0.0 0.0
1985 5002 0.0 0.0 0.0
1986 2699 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-01-12 Lost Circulation 64.00 64.00
1982-01-13 Lost Circulation 170.00 173.00

For data sources see[6]

References