X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444053304000

Well Details

Well ID: 0444053304000
Loading map...
Location: 00/04-33-044-05W4/0
Location Alias: 00/04-33-44-05 W4M
Location Alias 2: 00/04-33-044-05 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 05
Section: 33
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN HZ 4C1 WAINWR 4-33-44-5
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0465249
License Date: 2014-02-21
License Status: Issued
Spud Date: 2014-03-02
Final Drill Date: 2014-03-08
Well Total Depth: 1994.00 m
Surface Hole Latitude: 52.831470
Surface Hole Longitude: -110.653077

For data sources see[1][2]

Well History

Date Event
2014-02-21 Obtained License
2014-03-03 Surface Casing Operation Performed
2014-03-04 Direction Drilling Operation Performed - Deviate
2014-03-05 Direction Drilling Operation Performed - Horizontal
2014-03-08 Finished Drilling
2014-03-08 Well Mode changed to Drilled and Cased
2014-03-12 Production Casing Operation Performed
2014-03-12 Well Log Performed
2014-03-14 Rig Released
2014-06-14 Well Log Performed
2014-07-12 Well Log Performed
2014-07-16 Well Log Performed
2014-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-29 Well Began Production
2014-08-29 Well Fluid changed to Crude Oil
2014-08-29 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-02 Precision Drilling Corporation 327 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-03-04 297.40 Deviate (5 - 79 degrees)
2014-03-05 808.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-07-28 Multi-Stage Fracture 1952.80 1952.90 0
2014-07-28 Multi-Stage Fracture 1561.50 1561.60 0
2014-07-28 Multi-Stage Fracture 1532.20 1532.30 0
2014-07-28 Multi-Stage Fracture 1490.40 1490.50 0
2014-07-28 Multi-Stage Fracture 1449.20 1449.30 0
2014-07-28 Multi-Stage Fracture 1407.10 1407.20 0
2014-07-28 Multi-Stage Fracture 1361.90 1362.00 0
2014-07-29 Multi-Stage Fracture 1320.60 1320.70 0
2014-07-29 Multi-Stage Fracture 1279.00 1279.10 0
2014-07-29 Multi-Stage Fracture 1237.20 1237.30 0
2014-07-29 Multi-Stage Fracture 1196.80 1196.90 0
2014-07-28 Multi-Stage Fracture 1908.20 1908.30 0
2014-07-29 Multi-Stage Fracture 1155.50 1155.60 0
2014-07-29 Multi-Stage Fracture 1114.00 1114.10 0
2014-07-29 Multi-Stage Fracture 1072.40 1072.50 0
2014-07-29 Multi-Stage Fracture 1031.40 1031.50 0
2014-07-29 Multi-Stage Fracture 989.90 990.00 0
2014-07-29 Multi-Stage Fracture 948.50 948.60 0
2014-07-29 Multi-Stage Fracture 906.60 906.70 0
2014-07-29 Multi-Stage Fracture 866.10 866.20 0
2014-07-28 Multi-Stage Fracture 1866.30 1866.40 0
2014-07-28 Multi-Stage Fracture 1825.20 1825.30 0
2014-07-28 Multi-Stage Fracture 1783.30 1783.40 0
2014-07-28 Multi-Stage Fracture 1741.40 1741.50 0
2014-07-28 Multi-Stage Fracture 1700.20 1700.30 0
2014-07-28 Multi-Stage Fracture 1658.40 1658.50 0
2014-07-28 Multi-Stage Fracture 1616.40 1616.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-07-28 2014-07-29 637 798 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 79.4873 N/A
FRAC SAND. 16/30 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 18.9061 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 0.5411 N/A
2K7 Water Soluble Paks Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0174 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0597 N/A
ClaySurf-9L Baker Hughes Clay Control Cocamido propyl betaine 61789-40-0 100 0.2557 N/A
Complex polyamine salt 138879-94-4 100 0.2557 N/A
Non-hazardous Not Available 100 0.2557 N/A
KCl Talisman Clay Control Potassium Chloride Not Available 100 0.03 N/A
CXB-2 Baker Hughes Crosslinker Methanol 67-56-1 100 0.272 N/A
Non-hazardous Not Available 100 0.272 N/A
Sodium borate 7775-19-1 100 0.272 N/A
Sodium hydroxide 1310-73-2 100 0.272 N/A
GW-3SLR Baker Hughes Gelling Agent Guar gum 9000-30-0 100 0.4604 N/A
Low toxicity base oils - Non-WHMIS Controlled Not Available 100 0.4604 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-07-17 2014-07-17 Surface Water - Lake 1100

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2568 0.0 0.0 0.0
2015 7939 0.0 0.0 0.0
2016 8304 0.0 0.0 0.0
2017 7844 0.0 0.0 0.0
2018 6372 0.0 0.0 0.0
2019 7825 0.0 0.0 0.0
2020 1740 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-14 No Incident Encountered 0.00 0.00
2014-08-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References