X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444042805002

Well Details

Well ID: 0444042805002
Loading map...
Location: 00/05-28-044-04W4/2
Location Alias: 00/05-28-44-04 W4M
Location Alias 2: 00/05-28-044-04 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 04
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: BVI EDGERTON 5-28-44-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0113952
License Date: 1985-03-13
License Status: RecCertified
Spud Date: 1985-04-11
Final Drill Date: 1985-04-15
Well Total Depth: 675.00 m
Surface Hole Latitude: 52.820846
Surface Hole Longitude: -110.535322

For data sources see[1][2]

Well History

Date Event
1985-03-13 Obtained License
1985-04-12 Surface Casing Operation Performed
1985-04-15 Finished Drilling
1985-04-15 Production Casing Operation Performed
1985-04-15 Well Log Performed
1985-04-16 Rig Released
1985-05-03 Well Log Performed
1985-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-04 Perforation Treatment Performed - Jet Perforation
1985-05-04 Well Log Performed
1985-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-08 Perforation Treatment Performed - Jet Perforation
1985-05-08 Well Log Performed
1985-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-11-13 Plug Back Performed
1993-06-03 Well Log Performed
1993-06-04 Perforation Treatment Performed - Jet Perforation
1993-06-04 Well Log Performed
1993-06-07 Well Mode changed to Drilled and Cased
1993-11-04 Well Began Production
1993-11-04 Well Fluid changed to Gas
1993-11-04 Well Mode changed to Flowing
1994-08-05 Well Fluid changed to Gas
1994-08-05 Well Mode changed to Suspended
1997-09-18 Perforation Treatment Performed - Cement Squeeze
1997-09-18 Well Log Performed
1998-09-24 Well Log Performed
1998-10-30 Well Log Performed
1998-11-07 Well Abandoned
1998-11-07 Well Fluid changed to Gas
1998-11-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-04 Perforation 652.20 653.30 13
1997-09-18 Cement Squeeze 581.00 589.50 0
1985-05-04 Acid Treatment 652.20 653.30 0
1985-05-05 Acid Treatment 652.20 653.30 0
1985-05-08 Perforation 640.00 647.00 13
1985-05-09 Acid Treatment 640.00 647.00 0
1987-11-13 Packing Device Capped w/Cement 610.00 650.00 0
1993-06-04 Perforation 581.00 582.50 13
1993-06-04 Perforation 584.50 586.00 13
1993-06-04 Perforation 588.00 589.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1141 0.0 0.0 0.0
1994 4498 0.0 0.0 0.0

For data sources see[5]

References