X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435093008000

Well Details

Well ID: 0435093008000
Loading map...
Location: 00/08-30-043-09W5/0
Location Alias: 00/08-30-43-09 W5M
Location Alias 2: 00/08-30-043-09 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 30
County/Municipality: O'Chiese 203
Well Name: BELLATRIX HZ FERRIER 8-30-43-9
Operator Name: Bellatrix Exploration Ltd.
License Number: 0455562
License Date: 2013-03-04
License Status: Issued
Spud Date: 2013-04-09
Final Drill Date: 2013-04-26
Well Total Depth: 3591.00 m
Surface Hole Latitude: 52.734990
Surface Hole Longitude: -115.305803

For data sources see[1][2]

Well History

Date Event
2013-03-04 Obtained License
2013-04-09 Lost Circulation Occurred
2013-04-11 Surface Casing Operation Performed
2013-04-13 Lost Circulation Occurred
2013-04-17 Well Log Performed
2013-04-18 Intermediate Casing Operation Performed
2013-04-20 Direction Drilling Operation Performed - Deviate
2013-04-21 Direction Drilling Operation Performed - Horizontal
2013-04-26 Finished Drilling
2013-04-26 Well Log Performed
2013-04-26 Well Mode changed to Drilled and Cased
2013-04-28 Production Casing Operation Performed
2013-04-29 Rig Released
2013-06-11 Well Log Performed
2013-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2013-06-29 Perforation Treatment Performed - Open-Hole Completion
2013-07-02 Well Began Production
2013-07-02 Well Fluid changed to Gas
2013-07-02 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-04-20 1838.40 Deviate (5 - 79 degrees)
2013-04-21 2156.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-06-29 Open Hole/Barefoot Completion 3586.00 3591.00 0
2013-06-29 Multi-Stage Fracture 2936.00 2936.10 0
2013-06-29 Multi-Stage Fracture 2877.10 2877.20 0
2013-06-29 Multi-Stage Fracture 2791.20 2791.30 0
2013-06-29 Multi-Stage Fracture 2719.10 2719.20 0
2013-06-29 Multi-Stage Fracture 2620.60 2620.70 0
2013-06-29 Multi-Stage Fracture 2561.70 2561.80 0
2013-06-29 Multi-Stage Fracture 2476.20 2476.30 0
2013-06-29 Multi-Stage Fracture 3561.40 3561.50 0
2013-06-29 Multi-Stage Fracture 3482.10 3482.20 0
2013-06-29 Multi-Stage Fracture 3409.80 3409.90 0
2013-06-29 Multi-Stage Fracture 3323.90 3324.00 0
2013-06-29 Multi-Stage Fracture 3265.10 3265.20 0
2013-06-29 Multi-Stage Fracture 3179.20 3179.30 0
2013-06-29 Multi-Stage Fracture 3093.40 3093.50 0
2013-06-29 Multi-Stage Fracture 3021.10 3021.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-29 2013-06-29 2,162 2,461 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.982 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.756 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.3678 N/A
Tolcide PS75LT Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0248 N/A
Water 7732-18-5 100 0.0255 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1966 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0882 N/A
Ethoxylated phenolic resin 8300 100 0.0897 N/A
Isobutyl ketone 8300 100 0.0881 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1037 N/A
Organic acid salts 1 8300 100 0.0882 N/A
Organic acid salts 2 8300 100 0.0892 N/A
Organic acid salts 3 8300 100 0.0897 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 4.2621 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.091 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-06-27 2013-06-27 Surface Water - Runoff 974
2013-06-28 2013-06-28 Recycled Fracturing Water (treated at well site) 1825

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4411 0.0 0.0 0.0
2014 8712 0.0 0.0 0.0
2015 8563 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8541 0.0 0.0 0.0
2018 8315 0.0 0.0 0.0
2019 7654 0.0 0.0 0.0
2020 2033 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-04-09 Lost Circulation 52.00 606.00
2013-04-13 Lost Circulation 997.00 1621.00
2013-07-03 No Incident Encountered 0.00 0.00

For data sources see[9]

References