X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435092913000

Well Details

Well ID: 0435092913000
Loading map...
Location: 00/13-29-043-09W5/0
Location Alias: 00/13-29-43-09 W5M
Location Alias 2: 00/13-29-043-09 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 29
County/Municipality: Clearwater County
Well Name: CALPINE WILLGR 13-29-43-9
Operator Name: Yangarra Resources Corp.
License Number: 0252589
License Date: 2001-03-06
License Status: Abandoned
Spud Date: 2001-03-15
Final Drill Date: 2001-04-16
Well Total Depth: 2978.00 m
Surface Hole Latitude: 52.739543
Surface Hole Longitude: -115.278986

For data sources see[1][2]

Well History

Date Event
2001-03-06 Obtained License
2001-03-18 Surface Casing Operation Performed
2001-03-20 Lost Circulation Occurred
2001-03-29 Lost Circulation Occurred
2001-04-02 Direction Drilling Operation Performed - Deviate
2001-04-07 Well Log Performed
2001-04-08 Lost Circulation Occurred
2001-04-09 Intermediate Casing Operation Performed
2001-04-16 Finished Drilling
2001-04-16 Well Log Performed
2001-04-17 Liner Casing Operation Performed
2001-04-18 Rig Released
2001-04-18 Well Mode changed to Drilled and Cased
2001-05-04 Well Log Performed
2001-05-06 Perforation Treatment Performed - Jet Perforation
2001-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-10 Well Log Performed
2001-05-12 Perforation Treatment Performed - Jet Perforation
2001-05-14 Perforation Treatment Performed - Jet Perforation
2001-05-14 Well Log Performed
2001-05-16 Perforation Treatment Performed - Jet Perforation
2001-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-22 Plug Back Performed
2001-05-22 Well Mode changed to Abandoned Zone
2001-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-23 Perforation Treatment Performed - Jet Perforation
2001-05-23 Well Log Performed
2001-05-24 Perforation Treatment Performed - Jet Perforation
2001-05-25 Perforation Treatment Performed - Cement Squeeze
2001-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-27 Perforation Treatment Performed - Jet Perforation
2001-05-27 Plug Back Performed
2001-06-07 Well Log Performed
2001-06-08 Perforation Treatment Performed - Jet Perforation
2001-06-09 Perforation Treatment Performed - Cement Squeeze
2001-06-11 Perforation Treatment Performed - Jet Perforation
2001-06-11 Well Log Performed
2001-06-12 Perforation Treatment Performed - Fractured
2002-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-16 Plug Back Performed
2002-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-17 Plug Back Performed
2002-09-17 Well Log Performed
2002-09-18 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-04-02 2266.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-05-06 Perforation 2955.00 2962.00 20
2001-05-24 Perforation 2830.70 2831.00 17
2001-05-25 Cement Squeeze 2830.70 2845.30 0
2001-05-27 Perforation 2828.50 2831.00 16
2001-05-27 Acid Treatment 2828.50 2831.00 0
2001-05-27 Packing Device Capped w/Cement 2815.00 2823.00 0
2001-06-08 Perforation 2750.00 2750.30 72
2001-06-09 Cement Squeeze 2750.00 2750.30 0
2001-06-11 Perforation 2729.00 2730.50 20
2001-06-12 Fracture 2729.00 2730.50 0
2002-09-16 Packing Device Capped w/Cement 2709.00 2717.00 0
2001-05-08 Acid Treatment 2955.00 2962.00 0
2002-09-17 Packing Device Capped w/Cement 2687.00 2695.00 0
2001-05-10 Packing Device Capped w/Cement 2946.00 2949.00 0
2001-05-12 Perforation 2935.00 2936.50 16
2001-05-14 Perforation 2917.50 2920.00 17
2001-05-16 Perforation 2908.50 2912.00 17
2001-05-22 Packing Device Capped w/Cement 2897.00 2905.00 0
2001-05-23 Perforation 2845.00 2845.30 70
2001-05-23 Acid Treatment 2845.00 2845.30 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-03-20 Lost Circulation 951.00 1202.00
2001-03-29 Lost Circulation 1985.00 2056.00
2001-04-08 Lost Circulation 1475.00 1980.00

For data sources see[6]

References