X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435092816000

Well Details

Well ID: 0435092816000
Loading map...
Location: 00/16-28-043-09W5/0
Location Alias: 00/16-28-43-09 W5M
Location Alias 2: 00/16-28-043-09 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 28
County/Municipality: Clearwater County
Well Name: VEI HZ WILLGR 16-28-43-9
Operator Name: Vermilion Energy Inc.
License Number: 0466187
License Date: 2014-04-10
License Status: Issued
Spud Date: 2014-07-04
Final Drill Date: 2014-07-23
Well Total Depth: 3900.00 m
Surface Hole Latitude: 52.734832
Surface Hole Longitude: -115.260224

For data sources see[1][2]

Well History

Date Event
2014-04-10 Obtained License
2014-07-06 Surface Casing Operation Performed
2014-07-07 Well Log Performed
2014-07-11 Direction Drilling Operation Performed - Deviate
2014-07-15 Direction Drilling Operation Performed - Horizontal
2014-07-16 Intermediate Casing Operation Performed
2014-07-23 Finished Drilling
2014-07-23 Well Mode changed to Drilled and Cased
2014-07-24 Well Log Performed
2014-07-25 Production Casing Operation Performed
2014-07-26 Rig Released
2014-10-01 Perforation Treatment Performed - Open-Hole Completion
2014-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-10 Well Began Production
2015-08-10 Well Fluid changed to Crude Oil
2015-08-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-07-04 Nabors Drilling Limited 19 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-07-11 1625.00 Deviate (5 - 79 degrees)
2014-07-15 2338.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-01 Open Hole/Barefoot Completion 3892.00 3900.00 0
2014-10-03 Multi-Stage Fracture 3247.30 3247.40 0
2014-10-03 Multi-Stage Fracture 3158.10 3158.20 0
2014-10-03 Multi-Stage Fracture 3082.00 3082.10 0
2014-10-03 Multi-Stage Fracture 3007.60 3007.70 0
2014-10-03 Multi-Stage Fracture 2933.00 2933.10 0
2014-10-03 Multi-Stage Fracture 2844.40 2844.50 0
2014-10-03 Multi-Stage Fracture 2769.50 2769.60 0
2014-10-04 Multi-Stage Fracture 2680.80 2680.90 0
2014-10-04 Multi-Stage Fracture 2605.80 2605.90 0
2014-10-04 Multi-Stage Fracture 2543.90 2544.00 0
2014-10-02 Multi-Stage Fracture 3866.50 3866.60 0
2014-10-02 Multi-Stage Fracture 3816.40 3816.50 0
2014-10-02 Multi-Stage Fracture 3756.00 3756.10 0
2014-10-02 Multi-Stage Fracture 3680.50 3680.60 0
2014-10-03 Multi-Stage Fracture 3605.20 3605.30 0
2014-10-03 Multi-Stage Fracture 3516.00 3516.10 0
2014-10-03 Multi-Stage Fracture 3426.60 3426.70 0
2014-10-03 Multi-Stage Fracture 3337.30 3337.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-02 2014-10-04 2,066 2,779 N/A
2 2014-10-03 2014-10-04 2,066 0 N/A
3 2014-10-02 2014-10-03 2,066 0 N/A
4 2014-10-02 2014-10-02 2,066 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 5.0922 N/A
water Not Available 100 87.2302 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 9.1957 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.443 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.016 N/A
dibromoacetonitrile 3252-43-5 100 0.016 N/A
non-hazardous ingredients Not Available 100 0.016 N/A
polyethylene glycol 25322-68-3 100 0.016 N/A
sodium bromide 7647-15-6 100 0.016 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.2157 N/A
water Not Available 100 0.2157 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.1006 N/A
propylene glycol 57-55-6 100 0.1006 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0883 N/A
2 EnCap-LP Trican Breaker ammonium persulfate 7727-54-0 100 0.0167 N/A
cured acrylic resin Not Available 100 0.0167 N/A
silica crystalline 14808-60-7 100 0.0167 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.095 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.2099 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.2099 N/A
WG-111L Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.6768 N/A
polysaccharide blend Not Available 100 0.6768 N/A
3 GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1422 N/A
4 SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.117 N/A
aminofunctional polymer 8985 100 0.117 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.117 N/A
isopropanol 67-63-0 100 0.117 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-10-01 2014-10-02 Surface Water - River 2266
2014-10-03 2014-10-04 Recycled Fracturing Water (treated at well site) 343

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2252 0.0 0.0 0.0
2016 8551 0.0 0.0 0.0
2017 8451 0.0 0.0 0.0
2018 7960 0.0 0.0 0.0
2019 8256 0.0 0.0 0.0
2020 2009 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-26 No Incident Encountered 0.00 0.00
2014-10-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References