X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435092604020

Well Details

Well ID: 0435092604020
Loading map...
Location: 02/04-26-043-09W5/0
Location Alias: 02/04-26-43-09 W5M
Location Alias 2: 02/04-26-043-09 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 26
County/Municipality: Clearwater County
Well Name: BONTERRA HZ WILLGR 4-26-43-9
Operator Name: Bonterra Energy Corp.
License Number: 0440819
License Date: 2011-12-09
License Status: Issued
Spud Date: 2012-01-15
Final Drill Date: 2012-02-13
Well Total Depth: 3572.00 m
Surface Hole Latitude: 52.730509
Surface Hole Longitude: -115.184632

For data sources see[1][2]

Well History

Date Event
2011-12-09 Obtained License
2012-01-16 Surface Casing Operation Performed
2012-01-17 Well Log Performed
2012-01-19 Direction Drilling Operation Performed - Horizontal
2012-01-24 Intermediate Casing Operation Performed
2012-01-28 Well Log Performed
2012-02-04 Well Log Performed
2012-02-13 Finished Drilling
2012-02-13 Well Mode changed to Drilled and Cased
2012-02-16 Liner Casing Operation Performed
2012-02-16 Perforation Treatment Performed - Open-Hole Completion
2012-02-17 Rig Released
2012-02-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-01 Well Began Production
2012-03-01 Well Fluid changed to Crude Oil
2012-03-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-15 Trinidad Drilling Ltd. 31 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-19 1743.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-16 Open Hole/Barefoot Completion 3528.00 3572.00 0
2012-03-01 Multi-Stage Fracture 2730.00 2730.10 0
2012-03-01 Multi-Stage Fracture 2631.10 2631.20 0
2012-03-01 Multi-Stage Fracture 2543.80 2543.90 0
2012-03-01 Multi-Stage Fracture 2456.40 2456.50 0
2012-02-29 Multi-Stage Fracture 3523.50 3523.60 0
2012-02-29 Multi-Stage Fracture 3423.60 3423.70 0
2012-02-29 Multi-Stage Fracture 3324.80 3324.90 0
2012-02-29 Multi-Stage Fracture 3226.00 3226.10 0
2012-03-01 Multi-Stage Fracture 3126.90 3127.00 0
2012-03-01 Multi-Stage Fracture 3027.60 3027.70 0
2012-03-01 Multi-Stage Fracture 2928.40 2928.50 0
2012-03-01 Multi-Stage Fracture 2829.30 2829.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6190 0.0 0.0 0.0
2013 7859 0.0 0.0 0.0
2014 8173 0.0 0.0 0.0
2015 5195 0.0 0.0 0.0
2016 7933 0.0 0.0 0.0
2017 7769 0.0 0.0 0.0
2018 7641 0.0 0.0 0.0
2019 8209 0.0 0.0 0.0
2020 1858 0.0 0.0 0.0

For data sources see[7]

References