If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435092516030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.728324,"lon":-115.165941,"icon":""}]} |
Location: 03/16-25-043-09W5/0 | |
Location Alias: 03/16-25-43-09 W5M | |
Location Alias 2: 03/16-25-043-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 09 | |
Section: 25 | |
County/Municipality: Clearwater County | |
Well Name: PENN WEST 103 HZ WILLGR 16-25-43-9 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0425013 | |
License Date: 2010-10-22 | |
License Status: Issued | |
Spud Date: 2011-03-21 | |
Final Drill Date: 2011-08-20 | |
Well Total Depth: 3139.00 m | |
Surface Hole Latitude: 52.728324 | |
Surface Hole Longitude: -115.165941 |
Date | Event |
---|---|
2010-10-22 | Obtained License |
2011-03-23 | Surface Casing Operation Performed |
2011-06-03 | Direction Drilling Operation Performed - Horizontal |
2011-06-07 | Intermediate Casing Operation Performed |
2011-08-12 | Well Log Performed |
2011-08-20 | Finished Drilling |
2011-08-20 | Well Mode changed to Drilled and Cased |
2011-08-23 | Liner Casing Operation Performed |
2011-08-23 | Rig Released |
2011-09-27 | Well Log Performed |
2011-10-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-14 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-12-20 | Well Began Production |
2011-12-20 | Well Fluid changed to Crude Oil |
2011-12-20 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-06-03 | 1684.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-14 | Open Hole/Barefoot Completion | 3098.10 | 3139.00 | 0 |
2011-10-30 | Multi-Stage Fracture | 2559.20 | 2559.30 | 0 |
2011-11-01 | Multi-Stage Fracture | 2504.30 | 2504.40 | 0 |
2011-11-01 | Multi-Stage Fracture | 2463.20 | 2463.30 | 0 |
2011-11-02 | Multi-Stage Fracture | 2408.50 | 2408.60 | 0 |
2011-11-03 | Multi-Stage Fracture | 2355.30 | 2355.40 | 0 |
2011-11-03 | Multi-Stage Fracture | 2312.90 | 2313.00 | 0 |
2011-11-03 | Multi-Stage Fracture | 2258.00 | 2258.10 | 0 |
2011-11-03 | Multi-Stage Fracture | 2203.80 | 2203.90 | 0 |
2011-10-14 | Multi-Stage Fracture | 3066.40 | 3066.50 | 0 |
2011-10-23 | Multi-Stage Fracture | 2917.00 | 2917.10 | 0 |
2011-10-23 | Multi-Stage Fracture | 2874.10 | 2874.20 | 0 |
2011-10-25 | Multi-Stage Fracture | 2820.00 | 2820.10 | 0 |
2011-10-25 | Multi-Stage Fracture | 2764.10 | 2764.20 | 0 |
2011-10-27 | Multi-Stage Fracture | 2708.40 | 2708.50 | 0 |
2011-10-30 | Multi-Stage Fracture | 2665.70 | 2665.80 | 0 |
2011-10-30 | Multi-Stage Fracture | 2613.90 | 2614.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 24 | 0.0 | 0.0 | 0.0 |
2012 | 7905 | 0.0 | 0.0 | 0.0 |
2013 | 8512 | 0.0 | 0.0 | 0.0 |
2014 | 8325 | 0.0 | 0.0 | 0.0 |
2015 | 8525 | 0.0 | 0.0 | 0.0 |
2016 | 6516 | 0.0 | 0.0 | 0.0 |
2017 | 8707 | 0.0 | 0.0 | 0.0 |
2018 | 8483 | 0.0 | 0.0 | 0.0 |
2019 | 8643 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[6]