If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435090101002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.685034,"lon":-115.169108,"icon":""}]} |
Location: 00/01-01-043-09W5/2 | |
Location Alias: 00/01-01-43-09 W5M | |
Location Alias 2: 00/01-01-043-09 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 09 | |
Section: 01 | |
County/Municipality: Clearwater County | |
Well Name: PENN WEST HZ WILLGR 1-1-43-9 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0437433 | |
License Date: 2011-10-04 | |
License Status: Amended | |
Spud Date: 2012-08-25 | |
Final Drill Date: 2012-08-31 | |
Well Total Depth: 3585.00 m | |
Surface Hole Latitude: 52.685034 | |
Surface Hole Longitude: -115.169108 |
Date | Event |
---|---|
2011-10-04 | Obtained License |
2011-11-27 | Direction Drilling Operation Performed - Deviate |
2012-08-25 | Direction Drilling Operation Performed - Horizontal |
2012-08-31 | Finished Drilling |
2012-08-31 | Well Log Performed |
2012-08-31 | Well Mode changed to Drilled and Cased |
2012-09-09 | Liner Casing Operation Performed |
2012-09-10 | Rig Released |
2012-10-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-01 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-10 | Well Began Production |
2012-11-10 | Well Fluid changed to Crude Oil |
2012-11-10 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-22 | Precision Drilling Corporation | 204 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-27 | 1720.00 | Deviate (5 - 79 degrees) |
2012-08-25 | 2192.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-01 | Open Hole/Barefoot Completion | 3574.00 | 3585.00 | 0 |
2012-10-08 | Multi-Stage Fracture | 2943.60 | 2943.70 | 0 |
2012-10-08 | Multi-Stage Fracture | 2862.40 | 2862.50 | 0 |
2012-10-10 | Multi-Stage Fracture | 2793.50 | 2793.60 | 0 |
2012-10-11 | Multi-Stage Fracture | 2711.70 | 2711.80 | 0 |
2012-10-11 | Multi-Stage Fracture | 2647.50 | 2647.60 | 0 |
2012-10-11 | Multi-Stage Fracture | 2560.70 | 2560.80 | 0 |
2012-10-11 | Multi-Stage Fracture | 2492.60 | 2492.70 | 0 |
2012-10-11 | Multi-Stage Fracture | 2423.10 | 2423.20 | 0 |
2012-10-11 | Multi-Stage Fracture | 2342.00 | 2342.10 | 0 |
2012-10-01 | Multi-Stage Fracture | 3539.00 | 3539.10 | 0 |
2012-10-01 | Multi-Stage Fracture | 3452.90 | 3453.00 | 0 |
2012-10-01 | Multi-Stage Fracture | 3383.60 | 3383.70 | 0 |
2012-10-04 | Multi-Stage Fracture | 3314.20 | 3314.30 | 0 |
2012-10-04 | Multi-Stage Fracture | 3233.40 | 3233.50 | 0 |
2012-10-07 | Multi-Stage Fracture | 3164.10 | 3164.20 | 0 |
2012-10-08 | Multi-Stage Fracture | 3082.40 | 3082.50 | 0 |
2012-10-08 | Multi-Stage Fracture | 3013.00 | 3013.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1224 | 0.0 | 0.0 | 0.0 |
2013 | 8679 | 0.0 | 0.0 | 0.0 |
2014 | 8518 | 0.0 | 0.0 | 0.0 |
2015 | 8433 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8619 | 0.0 | 0.0 | 0.0 |
2018 | 8579 | 0.0 | 0.0 | 0.0 |
2019 | 7778 | 0.0 | 0.0 | 0.0 |
2020 | 2089 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-10 | No Incident Encountered | 0.00 | 0.00 |
2012-10-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]