If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435082210020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.724415,"lon":-115.028513,"icon":""}]} |
Location: 02/10-22-043-08W5/0 | |
Location Alias: 02/10-22-43-08 W5M | |
Location Alias 2: 02/10-22-043-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 08 | |
Section: 22 | |
County/Municipality: Clearwater County | |
Well Name: OBE 102 HZ WILLGR 10-22-43-8 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0493596 | |
License Date: 2019-01-28 | |
License Status: Issued | |
Spud Date: 2019-08-01 | |
Final Drill Date: 2019-08-20 | |
Well Total Depth: 5120.00 m | |
Surface Hole Latitude: 52.724415 | |
Surface Hole Longitude: -115.028513 |
Date | Event |
---|---|
2019-01-28 | Obtained License |
2019-08-01 | Drill To LD |
2019-08-02 | Surface Casing Operation Performed |
2019-08-05 | Direction Drilling Operation Performed - Deviate |
2019-08-06 | Intermediate Casing Operation Performed |
2019-08-09 | Direction Drilling Operation Performed - Horizontal |
2019-08-09 | Well Log Performed |
2019-08-18 | Production Casing Operation Performed |
2019-08-18 | Well Log Performed |
2019-08-20 | Finished Drilling |
2019-08-20 | Rig Released |
2019-08-20 | Well Mode changed to Drilled and Cased |
2019-09-01 | Well Began Production |
2019-09-01 | Well Fluid changed to Crude Oil |
2019-09-01 | Well Mode changed to Flowing |
2019-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-10 | Well Fluid changed to Crude Oil |
2019-10-10 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-08-01 | Precision Drilling Corporation | 220 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-08-05 | 1565.60 | Deviate (5 - 79 degrees) |
2019-08-09 | 2060.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-09-22 | Multi-Stage Fracture | 4938.40 | 4939.40 | 0 |
2019-09-22 | Multi-Stage Fracture | 4236.10 | 4237.00 | 0 |
2019-09-22 | Multi-Stage Fracture | 4153.80 | 4154.80 | 0 |
2019-09-22 | Multi-Stage Fracture | 4073.00 | 4073.90 | 0 |
2019-09-22 | Multi-Stage Fracture | 3989.90 | 3990.80 | 0 |
2019-09-22 | Multi-Stage Fracture | 3908.50 | 3909.50 | 0 |
2019-09-22 | Multi-Stage Fracture | 3827.10 | 3828.00 | 0 |
2019-09-22 | Multi-Stage Fracture | 3744.70 | 3745.70 | 0 |
2019-09-22 | Multi-Stage Fracture | 3662.40 | 3663.40 | 0 |
2019-09-22 | Multi-Stage Fracture | 3583.50 | 3584.40 | 0 |
2019-09-22 | Multi-Stage Fracture | 3502.10 | 3503.10 | 0 |
2019-09-22 | Multi-Stage Fracture | 4882.60 | 4883.60 | 0 |
2019-09-22 | Multi-Stage Fracture | 3421.80 | 3422.70 | 0 |
2019-09-22 | Multi-Stage Fracture | 3340.20 | 3341.10 | 0 |
2019-09-22 | Multi-Stage Fracture | 3258.10 | 3259.00 | 0 |
2019-09-22 | Multi-Stage Fracture | 3176.50 | 3177.40 | 0 |
2019-09-22 | Multi-Stage Fracture | 3096.80 | 3097.70 | 0 |
2019-09-22 | Multi-Stage Fracture | 3017.00 | 3018.00 | 0 |
2019-09-22 | Multi-Stage Fracture | 2935.70 | 2936.60 | 0 |
2019-09-22 | Multi-Stage Fracture | 2854.90 | 2855.80 | 0 |
2019-09-22 | Multi-Stage Fracture | 2776.10 | 2777.00 | 0 |
2019-09-22 | Multi-Stage Fracture | 2695.30 | 2696.20 | 0 |
2019-09-22 | Multi-Stage Fracture | 4799.80 | 4800.80 | 0 |
2019-09-22 | Multi-Stage Fracture | 2613.10 | 2614.00 | 0 |
2019-09-22 | Multi-Stage Fracture | 2530.50 | 2531.40 | 0 |
2019-09-22 | Multi-Stage Fracture | 2448.30 | 2449.20 | 0 |
2019-09-22 | Multi-Stage Fracture | 2366.90 | 2367.80 | 0 |
2019-09-22 | Multi-Stage Fracture | 2288.40 | 2289.30 | 0 |
2019-09-22 | Multi-Stage Fracture | 2207.70 | 2208.60 | 0 |
2019-09-22 | Multi-Stage Fracture | 2127.50 | 2128.50 | 0 |
2019-09-22 | Multi-Stage Fracture | 2033.50 | 2034.50 | 0 |
2019-09-22 | Multi-Stage Fracture | 4719.10 | 4720.10 | 0 |
2019-09-22 | Multi-Stage Fracture | 4648.20 | 4649.10 | 0 |
2019-09-22 | Multi-Stage Fracture | 4565.90 | 4566.90 | 0 |
2019-09-22 | Multi-Stage Fracture | 4483.50 | 4484.40 | 0 |
2019-09-22 | Multi-Stage Fracture | 4400.90 | 4401.90 | 0 |
2019-09-22 | Multi-Stage Fracture | 4318.90 | 4319.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-09-22 | 2019-09-22 | 1,928 | 7,223 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 0 | N/A | |||
water | Not Available | 100 | 88.6366 | N/A | ||||
Sand - Tier 1 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 4.9247 | N/A | ||
Sand - Tier 1 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 7.0962 | N/A | ||
Aqucar DB20 Biocide | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0109 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0109 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0109 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0109 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0109 | N/A | ||||
WBO-2 Breaker Oxidizer | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0216 | N/A | |
CC-10 | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.0945 | N/A | |
HVFR-2 High Viscosity Friction Reducer | Trican | Friction Reducer | alcohols C12-C15. ethoxylated propoxylated | 68551-13-3 | 100 | 0.1969 | N/A | |
distillates (petroleum). hydrotreated heavy naphthenic | 64742-52-5 | 100 | 0.1969 | N/A | ||||
naphtha (petroleum). hydrotreated heavy | 64742-48-9 | 100 | 0.1969 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.1969 | N/A | ||||
S-28 Surfactant | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.083 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.083 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.083 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-09-19 | 2019-09-23 | Surface Water - River | 7317 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 2154 | 0.0 | 0.0 | 0.0 |
2020 | 1668 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-08-20 | No Incident Encountered | 0.00 | 0.00 |
2019-09-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]