X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435081603000

Well Details

Well ID: 0435081603000
Loading map...
Location: 00/03-16-043-08W5/0
Location Alias: 00/03-16-43-08 W5M
Location Alias 2: 00/03-16-043-08 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 08
Section: 16
County/Municipality: Clearwater County
Well Name: AMOCO WILLGR 3-16-43-8
Operator Name: Obsidian Energy Ltd.
License Number: 0068715
License Date: 1978-03-08
License Status: Issued
Spud Date: 1978-04-13
Final Drill Date: 1978-04-28
Well Total Depth: 1938.50 m
Surface Hole Latitude: 52.701676
Surface Hole Longitude: -115.101603

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-03-08 Obtained License
1978-04-13 Lost Circulation Occurred
1978-04-28 Finished Drilling
1978-04-28 Production Casing Operation Performed
1978-04-28 Well Mode changed to Drilled and Cased
1978-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-02 Perforation Treatment Performed - Jet Perforation
1978-06-03 Perforation Treatment Performed - Fractured
1978-06-29 Well Began Production
1978-06-29 Well Fluid changed to Crude Oil
1978-06-29 Well Mode changed to Flowing
1980-01-17 Well Fluid changed to Crude Oil
1980-01-17 Well Mode changed to Pumping
2009-02-23 Perforation Treatment Performed - Jet Perforation
2009-02-23 Well Log Performed
2009-02-25 Perforation Treatment Performed - Fractured
2020-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-06 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-06-02 Perforation 1909.30 1909.90 7
1978-06-02 Perforation 1911.40 1912.30 7
1978-06-02 Perforation 1916.90 1917.50 7
1978-06-02 Acid Treatment 1909.30 1917.50 0
1978-06-03 Fracture 1909.30 1917.50 0
2009-02-23 Perforation 1909.30 1917.70 14
2009-02-25 Fracture 1909.30 1917.70 0
2020-01-06 Acid Treatment 1909.30 1917.50 0
2020-01-06 Chemical Squeeze 1909.30 1917.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 4457 0.0 0.0 0.0
1979 8201 0.0 0.0 0.0
1980 8239 0.0 0.0 0.0
1981 8513 0.0 0.0 0.0
1982 8538 0.0 0.0 0.0
1983 8506 0.0 0.0 0.0
1984 7999 0.0 0.0 0.0
1985 7044 0.0 0.0 0.0
1986 4104 0.0 0.0 0.0
1987 3362 0.0 0.0 0.0
1990 1632 0.0 0.0 0.0
1991 8487 0.0 0.0 0.0
1992 8721 0.0 0.0 0.0
1993 8631 0.0 0.0 0.0
1994 3455 0.0 0.0 0.0
1995 2208 0.0 0.0 0.0
1996 8745 0.0 0.0 0.0
1997 8700 0.0 0.0 0.0
1998 7571 0.0 0.0 0.0
1999 8663 0.0 0.0 0.0
2000 8591 0.0 0.0 0.0
2001 8663 0.0 0.0 0.0
2002 8639 0.0 0.0 0.0
2003 8281 0.0 0.0 0.0
2004 8711 0.0 0.0 0.0
2005 8688 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8567 0.0 0.0 0.0
2008 7919 0.0 0.0 0.0
2009 8496 0.0 0.0 0.0
2010 8719 0.0 0.0 0.0
2011 8365 0.0 0.0 0.0
2012 8569 0.0 0.0 0.0
2013 8668 0.0 0.0 0.0
2014 8572 0.0 0.0 0.0
2015 8347 0.0 0.0 0.0
2016 8756 0.0 0.0 0.0
2017 8747 0.0 0.0 0.0
2018 7895 0.0 0.0 0.0
2019 8270 0.0 0.0 0.0
2020 2145 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-04-13 Lost Circulation 15.20 79.20
2020-01-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References