If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435070702020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.699467,"lon":-115.003083,"icon":""}]} |
Location: 02/02-07-043-07W5/0 | |
Location Alias: 02/02-07-43-07 W5M | |
Location Alias 2: 02/02-07-043-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 07 | |
Section: 07 | |
County/Municipality: Clearwater County | |
Well Name: OBE 102 HZ WILLGR 2-7-43-7 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0494819 | |
License Date: 2019-06-11 | |
License Status: Amended | |
Spud Date: 2019-10-13 | |
Final Drill Date: 2019-10-21 | |
Well Total Depth: 3421.00 m | |
Surface Hole Latitude: 52.699467 | |
Surface Hole Longitude: -115.003083 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-10-13 | Nabors Drilling Canada Limited | 26 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-10-15 | 1594.90 | Deviate (5 - 79 degrees) |
2019-10-19 | 2097.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-11-14 | Multi-Stage Fracture | 3389.00 | 3389.70 | 0 |
2019-11-15 | Multi-Stage Fracture | 2658.80 | 2659.40 | 0 |
2019-11-15 | Multi-Stage Fracture | 2573.30 | 2573.90 | 0 |
2019-11-15 | Multi-Stage Fracture | 2489.30 | 2490.00 | 0 |
2019-11-15 | Multi-Stage Fracture | 2403.40 | 2404.10 | 0 |
2019-11-15 | Multi-Stage Fracture | 2320.20 | 2320.80 | 0 |
2019-11-15 | Multi-Stage Fracture | 2238.40 | 2239.00 | 0 |
2019-11-15 | Multi-Stage Fracture | 2154.60 | 2155.80 | 0 |
2019-11-15 | Multi-Stage Fracture | 3331.90 | 3332.50 | 0 |
2019-11-15 | Multi-Stage Fracture | 3245.60 | 3246.30 | 0 |
2019-11-15 | Multi-Stage Fracture | 3162.40 | 3163.00 | 0 |
2019-11-15 | Multi-Stage Fracture | 3076.70 | 3077.40 | 0 |
2019-11-15 | Multi-Stage Fracture | 2992.30 | 2993.00 | 0 |
2019-11-15 | Multi-Stage Fracture | 2907.40 | 2908.10 | 0 |
2019-11-15 | Multi-Stage Fracture | 2822.60 | 2823.20 | 0 |
2019-11-15 | Multi-Stage Fracture | 2739.20 | 2739.80 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-11-14 | 2019-11-15 | 1,952 | 2,452 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 85.444 | N/A | |||
Sand - Tier 1 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 5.6816 | N/A | ||
Sand - Tier 1 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 8.5224 | N/A | ||
Aqucar DB20 Biocide | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0124 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0124 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0124 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0124 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0124 | N/A | ||||
WBO-2 Breaker Oxidizer | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0236 | N/A | |
CC-10 | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.0967 | N/A | |
HVFR-4 High Viscosity Friction Reducer | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.1047 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1047 | N/A | ||||
PFC-3 Proppant Flowback Control | Trican | Surfactant | aminofunctional polymer | 10352 | 100 | 0.0311 | N/A | |
glycol ether | 10352 | 100 | 0.0311 | N/A | ||||
petroleum distillates | 10352 | 100 | 0.0311 | N/A | ||||
silicon compound | 10352 | 100 | 0.0311 | N/A | ||||
S-28 Surfactant | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.083 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.083 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.083 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-11-14 | 2019-11-16 | Surface Water - River | 2536 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 758 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-10-22 | No Incident Encountered | 0.00 | 0.00 |
2019-12-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]