X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435070616020

Well Details

Well ID: 0435070616020
Loading map...
Location: 02/16-06-043-07W5/0
Location Alias: 02/16-06-43-07 W5M
Location Alias 2: 02/16-06-043-07 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 07
Section: 06
County/Municipality: Clearwater County
Well Name: OBE HZ 102 WILLGR 16-6-43-7
Operator Name: Obsidian Energy Ltd.
License Number: 0486309
License Date: 2017-11-15
License Status: Amended
Spud Date: 2017-12-01
Final Drill Date: 2017-12-09
Well Total Depth: 4092.00 m
Surface Hole Latitude: 52.680868
Surface Hole Longitude: -115.029491

For data sources see[1][2]

Well History

Date Event
2017-11-15 Obtained License
2017-12-02 Surface Casing Operation Performed
2017-12-05 Direction Drilling Operation Performed - Deviate
2017-12-06 Direction Drilling Operation Performed - Horizontal
2017-12-09 Finished Drilling
2017-12-09 Production Casing Operation Performed
2017-12-09 Well Log Performed
2017-12-09 Well Mode changed to Drilled and Cased
2017-12-12 Rig Released
2017-12-12 Well Log Performed
2018-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-10 Well Began Production
2018-01-10 Well Fluid changed to Crude Oil
2018-01-10 Well Mode changed to Flowing
2018-01-14 Well Log Performed
2018-02-20 Well Fluid changed to Crude Oil
2018-02-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-01 Nabors Drilling Canada Limited 26 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-05 1687.40 Deviate (5 - 79 degrees)
2017-12-06 2119.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-09 Multi-Stage Fracture 4061.90 4062.50 0
2018-01-09 Multi-Stage Fracture 3551.00 3551.40 0
2018-01-09 Multi-Stage Fracture 3493.00 3493.50 0
2018-01-09 Multi-Stage Fracture 3434.50 3435.00 0
2018-01-09 Multi-Stage Fracture 3376.00 3376.50 0
2018-01-09 Multi-Stage Fracture 3304.40 3304.80 0
2018-01-09 Multi-Stage Fracture 3231.80 3232.20 0
2018-01-09 Multi-Stage Fracture 3159.00 3159.40 0
2018-01-09 Multi-Stage Fracture 3086.60 3087.00 0
2018-01-09 Multi-Stage Fracture 3014.40 3014.80 0
2018-01-09 Multi-Stage Fracture 2942.00 2942.40 0
2018-01-09 Multi-Stage Fracture 4018.20 4018.60 0
2018-01-09 Multi-Stage Fracture 2869.80 2870.20 0
2018-01-09 Multi-Stage Fracture 2797.10 2797.60 0
2018-01-09 Multi-Stage Fracture 2724.30 2724.80 0
2018-01-09 Multi-Stage Fracture 2651.70 2652.10 0
2018-01-09 Multi-Stage Fracture 2578.80 2579.30 0
2018-01-09 Multi-Stage Fracture 2506.20 2506.60 0
2018-01-09 Multi-Stage Fracture 2433.60 2434.00 0
2018-01-09 Multi-Stage Fracture 2361.00 2361.40 0
2018-01-09 Multi-Stage Fracture 2289.40 2289.90 0
2018-01-09 Multi-Stage Fracture 2217.30 2217.80 0
2018-01-09 Multi-Stage Fracture 3960.10 3960.60 0
2018-01-09 Multi-Stage Fracture 2147.30 2147.70 0
2018-01-09 Multi-Stage Fracture 3901.60 3902.00 0
2018-01-09 Multi-Stage Fracture 3843.20 3843.60 0
2018-01-09 Multi-Stage Fracture 3784.80 3785.20 0
2018-01-09 Multi-Stage Fracture 3726.20 3726.60 0
2018-01-09 Multi-Stage Fracture 3668.00 3668.40 0
2018-01-09 Multi-Stage Fracture 3609.50 3609.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-09 2018-01-09 1,975 4,790 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.1276 N/A
water Not Available 100 83.4601 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 5.2087 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 7.9833 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0099 N/A
dibromoacetonitrile 3252-43-5 100 0.0099 N/A
non-hazardous ingredients Not Available 100 0.0099 N/A
polyethylene glycol 25322-68-3 100 0.0099 N/A
sodium bromide 7647-15-6 100 0.0099 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1848 N/A
water Not Available 100 0.1848 N/A
FR-23 Trican Friction Reducer acrylamide modified polymer Trade Secret 100 0.1099 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1099 N/A
non-hazardous ingredients Not Available 100 0.1099 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.089 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.089 N/A
methanol 67-56-1 100 0.089 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.089 N/A
non-hazardous ingredients Not Available 100 0.089 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-07 2018-01-09 Surface Water - River 4858

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7547 0.0 0.0 0.0
2019 8688 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-12 No Incident Encountered 0.00 0.00
2018-01-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References