If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435070406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.674075,"lon":-114.961134,"icon":""}]} |
Location: 00/06-04-043-07W5/0 | |
Location Alias: 00/06-04-43-07 W5M | |
Location Alias 2: 00/06-04-043-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 07 | |
Section: 04 | |
County/Municipality: Clearwater County | |
Well Name: HESS WILLGR 6-4-43-7 | |
Operator Name: 177293 Canada Ltd. | |
License Number: 0102974 | |
License Date: 1983-09-08 | |
License Status: RecCertified | |
Spud Date: 1983-09-21 | |
Final Drill Date: 1983-10-14 | |
Well Total Depth: 2550.00 m | |
Surface Hole Latitude: 52.674075 | |
Surface Hole Longitude: -114.961134 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-09-08 | Obtained License |
1983-10-08 | Drill Stem Test Performed |
1983-10-10 | Well Log Performed |
1983-10-11 | Drill Stem Test Performed |
1983-10-14 | Finished Drilling |
1983-10-14 | Well Mode changed to Drilled and Cased |
1983-10-15 | Well Log Performed |
1983-10-19 | Production Casing Operation Performed |
1983-11-28 | Perforation Treatment Performed - Jet Perforation |
1983-12-02 | Perforation Treatment Performed - Fractured |
1984-03-01 | Well Began Production |
1984-03-01 | Well Fluid changed to Crude Oil |
1984-03-01 | Well Mode changed to Flowing |
1985-04-04 | Well Fluid changed to Crude Oil |
1985-04-04 | Well Mode changed to Pumping |
1987-12-11 | Well Fluid changed to Crude Oil |
1987-12-11 | Well Mode changed to Suspended |
1996-06-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-06-07 | Perforation Treatment Performed - Jet Perforation |
1996-06-07 | Plug Back Performed |
1996-06-07 | Well Log Performed |
1996-06-08 | Perforation Treatment Performed - Remedial Casing |
1996-06-11 | Well Abandoned |
1996-06-11 | Well Fluid changed to Crude Oil |
1996-06-11 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-11-28 | Perforation | 2510.00 | 2515.00 | 7 |
1983-11-28 | Perforation | 2503.50 | 2507.00 | 7 |
1983-12-02 | Fracture | 2503.50 | 2515.00 | 0 |
1996-06-07 | Packing Device Capped w/Cement | 2487.00 | 2495.00 | 0 |
1996-06-07 | Perforation | 588.60 | 589.60 | 13 |
1996-06-08 | Remedial Casing Cementing | 588.60 | 589.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 6503 | 0.0 | 0.0 | 0.0 |
1985 | 8208 | 0.0 | 0.0 | 0.0 |
1986 | 3120 | 0.0 | 0.0 | 0.0 |
1987 | 2857 | 0.0 | 0.0 | 0.0 |
For data sources see[5]