If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435061908002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.71837,"lon":-114.851778,"icon":""}]} |
Location: 00/08-19-043-06W5/2 | |
Location Alias: 00/08-19-43-06 W5M | |
Location Alias 2: 00/08-19-043-06 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 06 | |
Section: 19 | |
County/Municipality: Clearwater County | |
Well Name: BIRCHILL WILLGR 8-19-43-6 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0330786 | |
License Date: 2005-05-11 | |
License Status: Issued | |
Spud Date: 2005-06-23 | |
Final Drill Date: 2005-07-05 | |
Well Total Depth: 2475.00 m | |
Surface Hole Latitude: 52.718370 | |
Surface Hole Longitude: -114.851778 |
Date | Event |
---|---|
2005-05-11 | Obtained License |
2005-06-25 | Surface Casing Operation Performed |
2005-06-29 | Kick Occurred |
2005-07-04 | Well Log Performed |
2005-07-05 | Drill Stem Test Performed |
2005-07-05 | Finished Drilling |
2005-07-05 | Well Mode changed to Drilled and Cased |
2005-07-07 | Production Casing Operation Performed |
2005-07-07 | Rig Released |
2005-07-12 | Perforation Treatment Performed - Jet Perforation |
2005-07-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-07-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-13 | Plug Back Performed |
2005-07-15 | Perforation Treatment Performed - Fractured |
2005-07-15 | Perforation Treatment Performed - Jet Perforation |
2005-09-27 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-07-12 | Perforation | 2361.00 | 2365.00 | 17 |
2005-07-13 | Acid Treatment | 2361.00 | 2365.00 | 0 |
2005-07-13 | Packing Device Capped w/Cement | 2345.00 | 2353.00 | 0 |
2005-07-15 | Perforation | 2253.50 | 2263.00 | 17 |
2005-07-15 | Fracture | 2253.50 | 2263.00 | 0 |
2005-09-27 | Perforation | 2059.50 | 2061.50 | 17 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2005-06-29 | Kick | 2060.00 | 2060.00 |
For data sources see[5]