X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434261502000

Well Details

Well ID: 0434261502000
Loading map...
Location: 00/02-15-043-26W4/0
Location Alias: 00/02-15-43-26 W4M
Location Alias 2: 00/02-15-043-26 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 26
Section: 15
County/Municipality: Ponoka County
Well Name: ABE CHIGWELL 2-15-43-26
Operator Name: AlphaBow Energy Ltd.
License Number: 0496079
License Date: 2019-10-16
License Status: Issued
Spud Date: 2019-10-25
Final Drill Date: 2019-11-03
Well Total Depth: 2927.00 m
Surface Hole Latitude: 52.689958
Surface Hole Longitude: -113.672853

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-25 Advance Drilling Ltd. 6 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-10-28 1052.60 Deviate (5 - 79 degrees)
2019-10-29 1599.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-11-15 Multi-Stage Fracture 2890.70 2890.80 0
2019-11-15 Multi-Stage Fracture 2486.30 2486.40 0
2019-11-15 Multi-Stage Fracture 2436.70 2436.80 0
2019-11-16 Multi-Stage Fracture 2387.20 2387.30 0
2019-11-16 Multi-Stage Fracture 2337.50 2337.60 0
2019-11-16 Multi-Stage Fracture 2287.60 2287.70 0
2019-11-16 Multi-Stage Fracture 2237.80 2237.90 0
2019-11-16 Multi-Stage Fracture 2188.10 2188.20 0
2019-11-16 Multi-Stage Fracture 2138.30 2138.40 0
2019-11-16 Multi-Stage Fracture 2089.10 2089.20 0
2019-11-16 Multi-Stage Fracture 2038.80 2038.90 0
2019-11-15 Multi-Stage Fracture 2853.80 2853.90 0
2019-11-16 Multi-Stage Fracture 1988.70 1988.80 0
2019-11-16 Multi-Stage Fracture 1939.00 1939.10 0
2019-11-16 Multi-Stage Fracture 1888.50 1888.60 0
2019-11-16 Multi-Stage Fracture 1838.50 1838.60 0
2019-11-16 Multi-Stage Fracture 1788.60 1788.70 0
2019-11-16 Multi-Stage Fracture 1739.40 1739.50 0
2019-11-16 Multi-Stage Fracture 1700.80 1700.90 0
2019-11-15 Multi-Stage Fracture 2803.40 2803.50 0
2019-11-15 Multi-Stage Fracture 2764.40 2764.50 0
2019-11-15 Multi-Stage Fracture 2714.00 2714.10 0
2019-11-15 Multi-Stage Fracture 2675.10 2675.20 0
2019-11-15 Multi-Stage Fracture 2625.10 2625.20 0
2019-11-15 Multi-Stage Fracture 2586.30 2586.40 0
2019-11-15 Multi-Stage Fracture 2536.30 2536.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-11-15 2019-11-16 1,422 1,515 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 84.5301 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 14.6741 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0515 N/A
water 7732-18-5 100 0.0515 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0376 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.0834 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1739 N/A
Ethylene glycol 107-21-1 100 0.1739 N/A
Potassium Carbonate 584-08-7 100 0.1739 N/A
Potassium Hydroxide 1310-58-3 100 0.1739 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3825 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0665 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0665 N/A
water 7732-18-5 100 0.0665 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-11-15 2019-11-16 Surface Water - Runoff 1515

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 637 0.0 0.0 0.0
2020 1995 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-25 No Incident Encountered 0.00 0.00
2019-11-15 No Incident Encountered 0.00 0.00

For data sources see[9]

References