X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434231111020

Well Details

Well ID: 0434231111020
Loading map...
Location: 02/11-11-043-23W4/0
Location Alias: 02/11-11-43-23 W4M
Location Alias 2: 02/11-11-043-23 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 23
Section: 11
County/Municipality: Ponoka County
Well Name: EMBER 102 MALMO 11-11-43-23
Operator Name: Ember Resources Inc.
License Number: 0324285
License Date: 2005-01-14
License Status: Issued
Spud Date: 2005-01-22
Final Drill Date: 2006-05-12
Well Total Depth: 410.00 m
Surface Hole Latitude: 52.692157
Surface Hole Longitude: -113.238224

For data sources see[1][2]

Well History

Date Event
2005-01-14 Obtained License
2005-01-23 Surface Casing Operation Performed
2005-01-25 Perforation Treatment Performed - Open-Hole Completion
2005-01-25 Rig Released
2005-01-25 Well Mode changed to Drilled and Cased
2005-02-26 Well Log Performed
2005-04-24 Well Began Production
2005-04-24 Well Fluid changed to Coalbed Methane-Coals Only
2005-04-24 Well Mode changed to Flowing
2006-05-12 Finished Drilling
2006-05-13 Production Casing Operation Performed
2006-05-18 Well Log Performed
2006-05-19 Well Log Performed
2006-05-20 Perforation Treatment Performed - Jet Perforation
2006-05-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-25 Open Hole/Barefoot Completion 242.50 400.00 0
2006-05-20 Perforation 301.40 303.70 17
2006-05-20 Perforation 304.30 305.00 17
2006-05-20 Perforation 286.10 286.70 17
2006-05-20 Perforation 288.80 289.30 17
2006-05-20 Perforation 266.30 267.10 17
2006-05-20 Perforation 267.90 268.80 17
2006-05-20 Perforation 257.10 258.20 17
2006-05-20 Perforation 243.20 243.70 17
2006-05-20 Perforation 246.80 247.40 17
2006-05-21 Fracture 384.00 385.00 0
2006-05-20 Perforation 384.00 385.00 17
2006-05-21 Fracture 355.10 358.70 0
2006-05-21 Fracture 345.90 351.20 0
2006-05-21 Fracture 322.00 325.50 0
2006-05-21 Fracture 312.70 313.20 0
2006-05-21 Fracture 301.40 305.00 0
2006-05-21 Fracture 286.10 289.30 0
2006-05-21 Fracture 266.30 268.80 0
2006-05-21 Fracture 257.10 258.20 0
2006-05-21 Fracture 243.20 247.40 0
2006-05-20 Perforation 355.10 355.80 17
2006-05-20 Perforation 357.90 358.70 17
2006-05-20 Perforation 345.90 346.50 17
2006-05-20 Perforation 350.10 351.20 17
2006-05-20 Perforation 322.00 322.70 17
2006-05-20 Perforation 325.00 325.50 17
2006-05-20 Perforation 312.70 313.20 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5909 0.0 0.0 0.0
2006 5708 0.0 0.0 0.0
2007 8680 0.0 0.0 0.0
2008 8754 0.0 0.0 0.0
2009 8621 0.0 0.0 0.0
2010 8752 0.0 0.0 0.0
2011 8733 0.0 0.0 0.0
2012 8651 0.0 0.0 0.0
2013 8707 0.0 0.0 0.0
2014 8742 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8703 0.0 0.0 0.0
2017 8726 0.0 0.0 0.0
2018 8722 0.0 0.0 0.0
2019 4342 0.0 0.0 0.0
2020 2154 0.0 0.0 0.0

For data sources see[5]

References