X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434223207022

Well Details

Well ID: 0434223207022
Loading map...
Location: 02/07-32-043-22W4/2
Location Alias: 02/07-32-43-22 W4M
Location Alias 2: 02/07-32-043-22 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 32
County/Municipality: Ponoka County
Well Name: EMBER 102 MALMO 7-32-43-22
Operator Name: Ember Resources Inc.
License Number: 0326395
License Date: 2005-02-14
License Status: Issued
Spud Date: 2005-02-18
Final Drill Date: 2005-02-21
Well Total Depth: 509.00 m
Surface Hole Latitude: 52.745380
Surface Hole Longitude: -113.155375

For data sources see[1][2]

Well History

Date Event
2005-02-14 Obtained License
2005-02-18 Surface Casing Operation Performed
2005-02-21 Finished Drilling
2005-02-21 Production Casing Operation Performed
2005-02-21 Rig Released
2005-02-21 Well Mode changed to Drilled and Cased
2005-02-25 Well Log Performed
2005-03-03 Perforation Treatment Performed - Jet Perforation
2005-05-11 Perforation Treatment Performed - Jet Perforation
2005-05-11 Well Log Performed
2005-05-13 Perforation Treatment Performed - Fractured
2005-06-07 Well Began Production
2005-06-07 Well Fluid changed to Coalbed Methane-Coals Only
2005-06-07 Well Mode changed to Flowing
2011-10-27 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-03 Perforation 371.50 375.50 14
2005-05-11 Perforation 235.60 236.30 7
2005-05-11 Perforation 240.90 241.40 7
2005-05-11 Perforation 242.00 243.10 7
2005-05-11 Perforation 244.00 244.40 7
2005-05-11 Perforation 248.20 249.00 7
2005-05-11 Perforation 251.00 251.40 7
2005-05-11 Perforation 259.60 261.00 7
2005-05-11 Perforation 262.30 263.30 7
2005-05-11 Perforation 274.50 275.00 7
2005-05-11 Perforation 277.30 280.00 7
2005-03-03 Perforation 388.50 389.50 14
2005-05-11 Perforation 284.70 285.10 7
2005-05-11 Perforation 285.70 286.10 7
2005-05-11 Perforation 287.10 287.70 7
2005-05-11 Perforation 288.50 289.20 7
2005-05-11 Perforation 298.00 298.50 7
2005-05-11 Perforation 301.00 301.40 7
2005-05-11 Perforation 311.00 311.80 7
2005-05-11 Perforation 318.80 319.40 7
2005-05-11 Perforation 323.50 324.10 7
2005-05-11 Perforation 328.20 329.50 7
2005-03-03 Perforation 392.00 394.00 14
2005-05-11 Perforation 331.80 332.40 7
2005-05-13 Fracture 224.20 332.40 0
2005-03-03 Perforation 420.50 422.00 14
2005-03-03 Perforation 424.00 425.50 14
2005-05-11 Perforation 224.20 224.60 7
2005-05-11 Perforation 225.70 227.00 7
2005-05-11 Perforation 232.40 233.00 7
2005-05-11 Perforation 233.40 234.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4818 0.0 0.0 0.0
2006 8645 0.0 0.0 0.0
2007 8700 0.0 0.0 0.0
2008 8458 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8738 0.0 0.0 0.0
2011 7024 0.0 0.0 0.0

For data sources see[5]

References