If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434222910002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.735835,"lon":-113.157615,"icon":""}]} |
Location: 00/10-29-043-22W4/2 | |
Location Alias: 00/10-29-43-22 W4M | |
Location Alias 2: 00/10-29-043-22 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 22 | |
Section: 29 | |
County/Municipality: Ponoka County | |
Well Name: EMBER ET AL MALMO 10-29-43-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0028624 | |
License Date: 1965-07-23 | |
License Status: Suspension | |
Spud Date: 1965-07-30 | |
Final Drill Date: 1965-08-09 | |
Well Total Depth: 1648.10 m | |
Surface Hole Latitude: 52.735835 | |
Surface Hole Longitude: -113.157615 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-07-23 | Obtained License |
1965-08-05 | Drill Stem Test Performed |
1965-08-09 | Finished Drilling |
1965-08-09 | Well Mode changed to Drilled and Cased |
1965-08-11 | Drill Stem Test Performed |
1965-08-12 | Production Casing Operation Performed |
1965-09-10 | Perforation Treatment Performed - Jet Perforation |
1989-09-19 | Well Log Performed |
1989-11-01 | Well Log Performed |
1991-07-16 | Well Log Performed |
1993-05-11 | Well Log Performed |
1993-06-16 | Perforation Treatment Performed - Cement Squeeze |
1993-06-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-18 | Perforation Treatment Performed - Jet Perforation |
1993-06-23 | Perforation Treatment Performed - Cement Squeeze |
1993-06-25 | Perforation Treatment Performed - Jet Perforation |
1993-06-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-12-14 | Well Log Performed |
1995-12-15 | Well Log Performed |
1995-12-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-12-16 | Plug Back Performed |
1995-12-17 | Perforation Treatment Performed - Jet Perforation |
1995-12-18 | Perforation Treatment Performed - Jet Perforation |
1996-06-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-06-27 | Plug Back Performed |
1996-06-27 | Well Log Performed |
1996-06-28 | Perforation Treatment Performed - Jet Perforation |
1996-06-29 | Perforation Treatment Performed - Fractured |
1996-08-01 | Well Began Production |
1996-08-01 | Well Fluid changed to Gas |
1996-08-01 | Well Mode changed to Flowing |
2009-06-01 | Well Fluid changed to Gas |
2009-06-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-09-10 | Perforation | 1616.00 | 1620.00 | 13 |
1995-12-17 | Perforation | 588.00 | 590.00 | 16 |
1995-12-17 | Perforation | 413.00 | 416.00 | 16 |
1995-12-17 | Perforation | 440.00 | 445.00 | 16 |
1995-12-17 | Perforation | 454.50 | 458.00 | 16 |
1995-12-18 | Perforation | 554.00 | 556.00 | 16 |
1996-06-27 | Packing Device Capped w/Cement | 1395.00 | 1403.00 | 0 |
1996-06-28 | Perforation | 416.00 | 418.00 | 13 |
1996-06-28 | Perforation | 424.00 | 426.00 | 13 |
1996-06-28 | Perforation | 428.50 | 430.00 | 13 |
1996-06-29 | Fracture | 413.00 | 430.00 | 0 |
1993-06-16 | Cement Squeeze | 1616.00 | 1620.00 | 0 |
1993-06-18 | Perforation | 1616.00 | 1616.90 | 17 |
1993-06-18 | Acid Treatment | 1616.00 | 1616.90 | 0 |
1993-06-23 | Cement Squeeze | 1616.00 | 1616.90 | 0 |
1993-06-25 | Perforation | 1616.00 | 1616.50 | 17 |
1993-06-26 | Acid Treatment | 1616.00 | 1616.50 | 0 |
1995-12-16 | Packing Device Capped w/Cement | 1598.00 | 1606.00 | 0 |
1995-12-17 | Perforation | 1410.00 | 1412.00 | 16 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 3092 | 0.0 | 0.0 | 0.0 |
1997 | 8196 | 0.0 | 0.0 | 0.0 |
1998 | 8508 | 0.0 | 0.0 | 0.0 |
1999 | 8068 | 0.0 | 0.0 | 0.0 |
2000 | 7072 | 0.0 | 0.0 | 0.0 |
2001 | 8340 | 0.0 | 0.0 | 0.0 |
2002 | 8631 | 0.0 | 0.0 | 0.0 |
2003 | 8256 | 0.0 | 0.0 | 0.0 |
2004 | 7847 | 0.0 | 0.0 | 0.0 |
2005 | 8393 | 0.0 | 0.0 | 0.0 |
2006 | 8669 | 0.0 | 0.0 | 0.0 |
2007 | 5067 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-07-03 | No Incident Encountered | 0.00 | 0.00 |
2019-02-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]