If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434222807000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.73245,"lon":-113.133492,"icon":""}]} |
Location: 00/07-28-043-22W4/0 | |
Location Alias: 00/07-28-43-22 W4M | |
Location Alias 2: 00/07-28-043-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 22 | |
Section: 28 | |
County/Municipality: Ponoka County | |
Well Name: EMBER ET AL MALMO 7-28-43-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0202954 | |
License Date: 1997-06-26 | |
License Status: Issued | |
Spud Date: 1997-07-12 | |
Final Drill Date: 1997-07-13 | |
Well Total Depth: 510.00 m | |
Surface Hole Latitude: 52.732450 | |
Surface Hole Longitude: -113.133492 |
Date | Event |
---|---|
1997-06-26 | Obtained License |
1997-07-13 | Finished Drilling |
1997-07-13 | Production Casing Operation Performed |
1997-07-13 | Rig Released |
1997-07-13 | Well Mode changed to Drilled and Cased |
1997-07-22 | Well Log Performed |
1997-07-29 | Perforation Treatment Performed - Jet Perforation |
1997-07-29 | Well Log Performed |
1997-08-02 | Perforation Treatment Performed - Jet Perforation |
1997-08-02 | Well Log Performed |
1997-08-12 | Well Log Performed |
2004-03-26 | Well Began Production |
2004-03-26 | Well Fluid changed to Gas |
2004-03-26 | Well Mode changed to Flowing |
2004-06-10 | Perforation Treatment Performed - Jet Perforation |
2005-01-27 | Perforation Treatment Performed - Jet Perforation |
2005-01-28 | Well Log Performed |
2005-02-01 | Perforation Treatment Performed - Fractured |
2005-02-06 | Well Fluid changed to Gas |
2005-02-06 | Well Log Performed |
2005-02-06 | Well Mode changed to Suspended |
2005-02-07 | Perforation Treatment Performed - Jet Perforation |
2005-02-07 | Well Log Performed |
2005-02-16 | Perforation Treatment Performed - Fractured |
2017-04-24 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-07-29 | Perforation | 405.50 | 410.00 | 13 |
2005-02-07 | Perforation | 317.30 | 318.30 | 14 |
2005-02-07 | Perforation | 314.50 | 315.10 | 14 |
2005-02-07 | Perforation | 303.70 | 304.10 | 14 |
2005-02-07 | Perforation | 296.10 | 297.00 | 14 |
2005-02-07 | Perforation | 286.70 | 287.10 | 14 |
2005-02-07 | Perforation | 282.70 | 283.30 | 14 |
2005-02-07 | Perforation | 274.00 | 275.00 | 14 |
2005-02-07 | Perforation | 272.60 | 273.30 | 14 |
2005-02-07 | Perforation | 266.10 | 267.50 | 14 |
2005-02-07 | Perforation | 264.00 | 265.70 | 14 |
1997-08-02 | Perforation | 402.50 | 405.00 | 13 |
2005-02-07 | Perforation | 262.60 | 263.10 | 14 |
2005-02-07 | Perforation | 248.70 | 250.40 | 14 |
2005-02-07 | Perforation | 246.00 | 246.50 | 14 |
2005-02-07 | Perforation | 238.70 | 239.00 | 14 |
2005-02-07 | Perforation | 228.60 | 229.00 | 14 |
2005-02-07 | Perforation | 227.00 | 228.00 | 14 |
2005-02-07 | Perforation | 225.80 | 226.20 | 14 |
2005-02-07 | Perforation | 220.20 | 220.60 | 14 |
2005-02-07 | Perforation | 213.90 | 214.40 | 14 |
2005-02-07 | Perforation | 211.60 | 212.00 | 14 |
2004-06-10 | Perforation | 405.50 | 410.00 | 13 |
2005-02-07 | Perforation | 209.00 | 209.40 | 14 |
2005-02-07 | Perforation | 204.80 | 207.00 | 14 |
2005-02-16 | Fracture | 317.30 | 320.30 | 0 |
2005-02-16 | Fracture | 314.50 | 315.10 | 0 |
2005-02-16 | Fracture | 303.70 | 304.10 | 0 |
2005-02-16 | Fracture | 296.10 | 297.00 | 0 |
2005-02-16 | Fracture | 286.70 | 287.10 | 0 |
2005-02-16 | Fracture | 282.70 | 283.30 | 0 |
2005-02-16 | Fracture | 272.60 | 275.00 | 0 |
2005-02-16 | Fracture | 262.60 | 267.50 | 0 |
2005-01-27 | Perforation | 380.00 | 382.00 | 14 |
2005-02-16 | Fracture | 248.70 | 250.40 | 0 |
2005-02-16 | Fracture | 246.00 | 246.50 | 0 |
2005-02-16 | Fracture | 238.70 | 239.00 | 0 |
2005-02-16 | Fracture | 225.80 | 229.00 | 0 |
2005-02-16 | Fracture | 220.00 | 220.60 | 0 |
2005-02-16 | Fracture | 211.60 | 214.40 | 0 |
2005-02-16 | Fracture | 204.80 | 209.40 | 0 |
2005-01-27 | Perforation | 372.00 | 374.00 | 14 |
2005-01-27 | Perforation | 350.00 | 352.00 | 14 |
2005-01-27 | Perforation | 339.00 | 341.00 | 14 |
2005-02-01 | Fracture | 380.00 | 382.00 | 0 |
2005-02-07 | Perforation | 319.80 | 320.30 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 2470 | 0.0 | 0.0 | 0.0 |
For data sources see[5]