If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434221913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.723715,"lon":-113.192052,"icon":""}]} |
Location: 00/13-19-043-22W4/0 | |
Location Alias: 00/13-19-43-22 W4M | |
Location Alias 2: 00/13-19-043-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 22 | |
Section: 19 | |
County/Municipality: Ponoka County | |
Well Name: EMBER MALMO 13-19-43-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0338171 | |
License Date: 2005-09-14 | |
License Status: Issued | |
Spud Date: 2005-12-03 | |
Final Drill Date: 2005-12-05 | |
Well Total Depth: 646.00 m | |
Surface Hole Latitude: 52.723715 | |
Surface Hole Longitude: -113.192052 |
Date | Event |
---|---|
2005-09-14 | Obtained License |
2005-12-04 | Surface Casing Operation Performed |
2005-12-05 | Finished Drilling |
2005-12-05 | Production Casing Operation Performed |
2005-12-05 | Rig Released |
2005-12-05 | Well Mode changed to Drilled and Cased |
2005-12-13 | Well Log Performed |
2005-12-18 | Perforation Treatment Performed - Jet Perforation |
2006-01-14 | Perforation Treatment Performed - Jet Perforation |
2006-01-15 | Perforation Treatment Performed - Jet Perforation |
2006-01-16 | Perforation Treatment Performed - Fractured |
2006-03-29 | Well Began Production |
2006-03-29 | Well Fluid changed to Gas |
2006-03-29 | Well Mode changed to Flowing |
2007-11-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2007-11-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-12-18 | Perforation | 432.00 | 434.20 | 14 |
2006-01-14 | Perforation | 342.20 | 342.80 | 7 |
2006-01-14 | Perforation | 340.00 | 340.90 | 7 |
2006-01-14 | Perforation | 332.40 | 333.00 | 7 |
2006-01-14 | Perforation | 327.50 | 328.30 | 7 |
2006-01-14 | Perforation | 322.00 | 322.80 | 7 |
2006-01-14 | Perforation | 291.70 | 293.50 | 7 |
2006-01-14 | Perforation | 286.80 | 287.50 | 7 |
2006-01-14 | Perforation | 279.20 | 281.00 | 7 |
2006-01-14 | Perforation | 277.40 | 278.00 | 7 |
2006-01-15 | Perforation | 268.00 | 268.50 | 7 |
2005-12-18 | Perforation | 420.30 | 423.50 | 14 |
2006-01-15 | Perforation | 266.00 | 266.80 | 7 |
2006-01-15 | Perforation | 261.00 | 261.50 | 7 |
2006-01-15 | Perforation | 251.20 | 251.80 | 7 |
2006-01-15 | Perforation | 249.00 | 249.80 | 7 |
2006-01-15 | Perforation | 246.10 | 248.00 | 7 |
2006-01-15 | Perforation | 238.00 | 239.00 | 7 |
2006-01-15 | Perforation | 235.50 | 236.00 | 7 |
2006-01-15 | Perforation | 233.00 | 233.50 | 7 |
2006-01-15 | Perforation | 229.80 | 232.20 | 7 |
2006-01-16 | Fracture | 374.20 | 434.20 | 0 |
2005-12-18 | Perforation | 415.20 | 416.50 | 14 |
2006-01-16 | Fracture | 229.80 | 345.00 | 0 |
2005-12-18 | Perforation | 410.20 | 411.50 | 14 |
2005-12-18 | Perforation | 405.80 | 407.50 | 14 |
2005-12-18 | Perforation | 389.90 | 392.60 | 14 |
2005-12-18 | Perforation | 386.00 | 387.80 | 14 |
2005-12-18 | Perforation | 374.20 | 379.00 | 14 |
2006-01-14 | Perforation | 344.20 | 345.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 6176 | 0.0 | 0.0 | 0.0 |
2007 | 3712 | 0.0 | 0.0 | 0.0 |
2008 | 8746 | 0.0 | 0.0 | 0.0 |
2009 | 8157 | 0.0 | 0.0 | 0.0 |
2010 | 8476 | 0.0 | 0.0 | 0.0 |
2011 | 8597 | 0.0 | 0.0 | 0.0 |
2012 | 8749 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 7682 | 0.0 | 0.0 | 0.0 |
2015 | 8602 | 0.0 | 0.0 | 0.0 |
2016 | 7245 | 0.0 | 0.0 | 0.0 |
2017 | 7631 | 0.0 | 0.0 | 0.0 |
2018 | 7944 | 0.0 | 0.0 | 0.0 |
2019 | 8647 | 0.0 | 0.0 | 0.0 |
2020 | 1696 | 0.0 | 0.0 | 0.0 |
For data sources see[5]