If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434220516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.68275,"lon":-113.149228,"icon":""}]} |
Location: 00/16-05-043-22W4/0 | |
Location Alias: 00/16-05-43-22 W4M | |
Location Alias 2: 00/16-05-043-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 22 | |
Section: 05 | |
County/Municipality: Ponoka County | |
Well Name: EMBER BASHAW 16-5-43-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0468846 | |
License Date: 2014-08-05 | |
License Status: Issued | |
Spud Date: 2014-08-13 | |
Final Drill Date: 2014-08-14 | |
Well Total Depth: 694.00 m | |
Surface Hole Latitude: 52.682750 | |
Surface Hole Longitude: -113.149228 |
Date | Event |
---|---|
2014-08-05 | Obtained License |
2014-08-13 | Surface Casing Operation Performed |
2014-08-14 | Finished Drilling |
2014-08-14 | Production Casing Operation Performed |
2014-08-14 | Well Mode changed to Drilled and Cased |
2014-08-15 | Rig Released |
2014-08-21 | Well Log Performed |
2014-09-18 | Perforation Treatment Performed - Jet Perforation |
2014-09-18 | Well Log Performed |
2014-09-24 | Perforation Treatment Performed - Fractured |
2014-10-24 | Well Began Production |
2014-10-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2014-10-24 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-08-13 | Savanna Drilling Corp. | 434 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-09-18 | Perforation | 616.00 | 617.00 | 13 |
2014-09-18 | Perforation | 302.50 | 303.50 | 13 |
2014-09-18 | Perforation | 291.50 | 292.50 | 13 |
2014-09-18 | Perforation | 286.00 | 287.00 | 13 |
2014-09-18 | Perforation | 277.00 | 278.50 | 13 |
2014-09-18 | Perforation | 262.00 | 264.00 | 13 |
2014-09-18 | Perforation | 256.80 | 257.80 | 13 |
2014-09-18 | Perforation | 251.00 | 252.50 | 13 |
2014-09-18 | Perforation | 246.00 | 247.00 | 13 |
2014-09-18 | Perforation | 243.50 | 244.50 | 13 |
2014-09-18 | Perforation | 240.00 | 241.00 | 13 |
2014-09-18 | Perforation | 611.50 | 612.50 | 13 |
2014-09-18 | Perforation | 230.00 | 233.00 | 13 |
2014-09-24 | Fracture | 616.00 | 617.00 | 0 |
2014-09-24 | Fracture | 611.50 | 612.50 | 0 |
2014-09-24 | Fracture | 604.00 | 605.00 | 0 |
2014-09-24 | Fracture | 582.00 | 583.00 | 0 |
2014-09-24 | Fracture | 575.50 | 576.50 | 0 |
2014-09-24 | Fracture | 340.50 | 342.00 | 0 |
2014-09-24 | Fracture | 318.50 | 319.50 | 0 |
2014-09-24 | Fracture | 313.50 | 314.50 | 0 |
2014-09-24 | Fracture | 304.00 | 305.00 | 0 |
2014-09-18 | Perforation | 604.00 | 605.00 | 13 |
2014-09-24 | Fracture | 302.50 | 303.50 | 0 |
2014-09-24 | Fracture | 291.50 | 292.50 | 0 |
2014-09-24 | Fracture | 286.00 | 287.00 | 0 |
2014-09-24 | Fracture | 277.00 | 278.50 | 0 |
2014-09-24 | Fracture | 262.00 | 264.00 | 0 |
2014-09-24 | Fracture | 256.80 | 257.80 | 0 |
2014-09-24 | Fracture | 251.00 | 252.50 | 0 |
2014-09-24 | Fracture | 246.00 | 247.00 | 0 |
2014-09-24 | Fracture | 243.50 | 244.50 | 0 |
2014-09-24 | Fracture | 240.00 | 241.00 | 0 |
2014-09-18 | Perforation | 582.00 | 583.00 | 13 |
2014-09-24 | Fracture | 230.00 | 233.00 | 0 |
2014-09-18 | Perforation | 575.50 | 576.50 | 13 |
2014-09-18 | Perforation | 340.50 | 342.00 | 13 |
2014-09-18 | Perforation | 318.50 | 319.50 | 13 |
2014-09-18 | Perforation | 313.50 | 314.50 | 13 |
2014-09-18 | Perforation | 304.00 | 305.00 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-09-24 | 2014-09-24 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen. liquid form | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 1656 | 0.0 | 0.0 | 0.0 |
2015 | 8758 | 0.0 | 0.0 | 0.0 |
2016 | 8775 | 0.0 | 0.0 | 0.0 |
2017 | 8742 | 0.0 | 0.0 | 0.0 |
2018 | 8576 | 0.0 | 0.0 | 0.0 |
2019 | 8555 | 0.0 | 0.0 | 0.0 |
2020 | 2126 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-08-15 | No Incident Encountered | 0.00 | 0.00 |
2014-09-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]