X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434220211000

Well Details

Well ID: 0434220211000
Loading map...
Location: 00/11-02-043-22W4/0
Location Alias: 00/11-02-43-22 W4M
Location Alias 2: 00/11-02-043-22 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 02
County/Municipality: Ponoka County
Well Name: EMBER MALMO 11-2-43-22
Operator Name: Ember Resources Inc.
License Number: 0341694
License Date: 2005-11-01
License Status: Issued
Spud Date: 2006-01-18
Final Drill Date: 2006-01-19
Well Total Depth: 397.00 m
Surface Hole Latitude: 52.678775
Surface Hole Longitude: -113.091442

For data sources see[1][2]

Well History

Date Event
2005-11-01 Obtained License
2006-01-18 Surface Casing Operation Performed
2006-01-19 Finished Drilling
2006-01-19 Production Casing Operation Performed
2006-01-19 Rig Released
2006-01-19 Well Mode changed to Drilled and Cased
2006-01-28 Well Log Performed
2006-02-12 Perforation Treatment Performed - Jet Perforation
2006-02-12 Well Log Performed
2006-02-25 Perforation Treatment Performed - Fractured
2006-06-07 Well Began Production
2006-06-07 Well Fluid changed to Coalbed Methane-Coals and Other
2006-06-07 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-12 Perforation 362.00 364.00 13
2006-02-12 Perforation 248.00 250.00 13
2006-02-12 Perforation 237.00 239.00 13
2006-02-12 Perforation 227.50 278.50 13
2006-02-25 Fracture 362.00 364.00 0
2006-02-25 Fracture 346.00 347.00 0
2006-02-25 Fracture 326.00 327.00 0
2006-02-25 Fracture 320.50 321.50 0
2006-02-25 Fracture 308.00 309.00 0
2006-02-25 Fracture 303.50 304.50 0
2006-02-25 Fracture 276.00 277.00 0
2006-02-12 Perforation 346.00 347.00 13
2006-02-25 Fracture 272.00 273.00 0
2006-02-25 Fracture 266.00 268.00 0
2006-02-25 Fracture 248.00 250.00 0
2006-02-25 Fracture 237.00 239.00 0
2006-02-25 Fracture 227.50 278.50 0
2006-02-12 Perforation 326.00 327.00 13
2006-02-12 Perforation 320.50 321.50 13
2006-02-12 Perforation 308.00 309.00 13
2006-02-12 Perforation 303.50 304.50 13
2006-02-12 Perforation 276.00 277.00 13
2006-02-12 Perforation 272.00 273.00 13
2006-02-12 Perforation 266.00 268.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4792 0.0 0.0 0.0
2007 8459 0.0 0.0 0.0
2008 8149 0.0 0.0 0.0
2009 8515 0.0 0.0 0.0
2010 8692 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8041 0.0 0.0 0.0
2017 3018 0.0 0.0 0.0
2018 8573 0.0 0.0 0.0
2019 6913 0.0 0.0 0.0
2020 1864 0.0 0.0 0.0

For data sources see[5]

References