X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434220110002

Well Details

Well ID: 0434220110002
Loading map...
Location: 00/10-01-043-22W4/2
Location Alias: 00/10-01-43-22 W4M
Location Alias 2: 00/10-01-043-22 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 01
County/Municipality: Ponoka County
Well Name: EMBER ET AL MALMO 10-1-43-22
Operator Name: Ember Resources Inc.
License Number: 0352922
License Date: 2006-02-27
License Status: Issued
Spud Date: 2006-03-11
Final Drill Date: 2006-03-12
Well Total Depth: 727.00 m
Surface Hole Latitude: 52.679315
Surface Hole Longitude: -113.057980

For data sources see[1][2]

Well History

Date Event
2006-02-27 Obtained License
2006-03-11 Surface Casing Operation Performed
2006-03-12 Finished Drilling
2006-03-12 Production Casing Operation Performed
2006-03-12 Rig Released
2006-03-12 Well Mode changed to Drilled and Cased
2006-03-15 Well Log Performed
2006-03-19 Perforation Treatment Performed - Jet Perforation
2006-03-19 Well Log Performed
2006-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-22 Perforation Treatment Performed - Jet Perforation
2006-03-22 Plug Back Performed
2006-03-22 Well Log Performed
2006-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-23 Perforation Treatment Performed - Jet Perforation
2006-03-23 Plug Back Performed
2006-03-23 Well Log Performed
2006-03-23 Well Mode changed to Abandoned Zone
2006-05-07 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-19 Perforation 610.00 612.00 14
2006-03-23 Perforation 291.70 292.30 7
2006-03-23 Perforation 289.80 290.30 7
2006-03-23 Perforation 281.00 281.90 7
2006-03-23 Perforation 278.30 279.80 7
2006-03-23 Perforation 274.50 275.50 7
2006-03-23 Perforation 263.50 265.20 7
2006-03-23 Perforation 255.70 256.40 7
2006-03-23 Perforation 251.00 252.00 7
2006-03-23 Perforation 237.30 240.00 7
2006-03-23 Perforation 224.20 225.60 7
2006-03-22 Packing Device Capped w/Cement 599.00 607.00 0
2006-03-23 Perforation 218.80 221.20 7
2006-03-23 Perforation 216.00 216.80 7
2006-03-23 Perforation 213.00 214.40 7
2006-03-23 Perforation 208.00 208.80 7
2006-05-07 Fracture 208.00 328.20 0
2006-03-22 Perforation 577.00 580.00 14
2006-03-22 Perforation 574.00 577.00 14
2006-03-23 Packing Device Capped w/Cement 562.00 570.00 0
2006-03-23 Perforation 327.20 328.20 7
2006-03-23 Perforation 321.10 321.90 7
2006-03-23 Perforation 308.80 309.50 7
2006-03-23 Perforation 303.10 304.00 7

For data sources see[4]



References